5
– FUNCTIONING AND USE
COD: 100M12/24.B.2021
EN
THE PRESENT MANUAL BELONGS TO -
Schenker Italia
- ALL RIGHTS RESERVED
29
5.2.1
Preliminary checks before proceeding with the start-up procedure
Perform the following checks before proceeding with the start-up procedure:
1. Verify all components and hoses are connected correctly.
2. Verify the 5 micron and active carbon cartridges are installed.
3. Check the seawater inlet valve and salt water drain valve (if existing) are open.
4. Check the reset valve is closed (lever
orthogonal
to the body valve) and the positioner completely
unscrewed.
5. Check the fresh water pressurizing pump of the boat is on.
6. Check the grey valve on the active carbon filter is open.
5.2.2 Start-up
1. Open the depressurization valve (unscrew the
valve).
2. Push Flushing for 5 seconds.
The panel emits 2 beeps, the push buttons
blinks quickly, and the sequence for purging
starts. After about 3 minutes the sequence will
finish. The sequence can be stopped at any time
pushing ON/OFF.
3. Start the unit again pushing ON/OFF.