6
– MAINTENANCE (ROUTINE AND SPECIAL)
COD: 100M12/24.B.2021
EN
THE PRESENT MANUAL BELONGS TO -
Schenker Italia
- ALL RIGHTS RESERVED
37
6.5.2
Shutdown operating procedure
1.
Prepare the solution carefully mixing the bottle of
SC1 in about 15 lit of unchlorinated water.
2. Connect the 3 pipes to the pre-pump and
watermaker as indicated above, and dip them in
the solution.
3. Check they are well dipped in the solution and
don't inhale air.
4. Open the depressurization valve
(turn counter clockwise).
Pipes under the free water surface