Schaffner Group
User and Installation Manual
Ecosine
max
55/66
8.3 Step 3: Wiring
8.3.1 Verify safe disconnection of all line side power
Consult your local safety instructions.
8.3.2 Carefully connect protective earth (PE) cable to
adequate earth potential close to ecosine filter
Use a cable with diameter of equal or bigger size as fore-
seen for line/load side power cables – according to your lo-
cal codes and safety instructions.
8.3.3 Connect PE cable of ecosine filter
with appropriate cable lug to threaded stud.
|
torque M12:
20-25 Nm