Schaffner Group
User and Installation Manual
Ecosine
max
41/66
3.14 Functional diagram
3.14.1 Filter configuration
Filter terminals
Line L1/L2/L3
3 busbar terminals at line side
Load L1’/L2’/L3’
3 busbar terminals at load side
TS, TS’
Connecting terminals to thermal switch NC 180°C (UL-
approved) to detect overload in chokes
AS, AS’
Terminal for auxiliary connection, details refer to section
8.3.7
PE
Protective earth. Threaded stud with washer and nut
Function blocks
Chokes
Power magnetic components incl. temperature switches
Capacitors
Power capacitors incl. discharge resistors
Circuit breaker
Make sure the status is “On” when install the filter
Status “On” during normal operation
Investigation of the system is required when the status of the
switch changed to “Off”