Schaffner International
Maintenance Manual
Ecosine
®
Full Performance HV Line
– Frame Size Small
May 2018
17/19
Replace the capacitor
4. Work instruction
– Reassembly process
Place the new capacitors, tighten the nuts with
a torque wrench and a 18 mm socket with 10
Nm, use the new cable tie for the fixation of
the capacitors.
Connect all cables on the capacitors to the
initial state. Tighten the nuts with a torque
wrench with 3 Nm