![Schaffner Ecosine FN34 Series Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/schaffner/ecosine-fn34-series/ecosine-fn34-series_maintenance-manual_1209943012.webp)
Schaffner International
Maintenance Manual
Ecosine
®
Full Performance HV Line
– Frame Size Small
May 2018
12/19
Check all capacitors with the capacitance
meter.
Choose capacitor test and connect the
RED +
and the
BLACK
–
probe to the capacitor.
Compare the result with the expected value of
the capacitor.
Attention!
If the result is less than
– 10%
contact
Schaffner Service
3. Work instruction
– Reassembly process
Connect all cables on the capacitors to the
initial state. Tighten the nuts with a torque
wrench with 3 Nm
Mount the cover and tighten the 2 screws with
a torque wrench and a 5,5 mm socket, with
1,7 Nm