background image

       

Schaffner International

 

Maintenance Manual 
Ecosine

®

 Full Performance HV Line 

– Frame Size Small 

May 2018 
19/19 

  

 

 
 

 

 

 

 

 

 

 

 

 

 

Schaffner Service Centers 

 
 

APAC 

Schaffner EMC Ltd. Shanghai 

T20-3, No 565 Chuangye Road 
Pudong New Area 
Shanghai 201201 
China 
 

EMEA 

Schaffner EMC S.A.S. 

Rue du Luxembourg 16 
68310 Wittelsheim 
France 
 

India 

Schaffner India Pvt. Ltd  

“ShriNivas” 26, 2nd Street,  
Kasthuri Nagar Extension,  
Ondipudur, Coimbatore - 641 016 
Tamil Nadu 
India 
 

North America 

Schaffner EMC Inc.  

52 Mayfield Avenue  
Edison 
New Jersey 08837 
United State of America 

 

Schaffner International Ltd 

Nordstrasse 11 
4542 Luterbach  
Switzerland 
T +41 32 681 66 26  
F +41 32 681 66 30 
[email protected] 
www.schaffner.com 

 

To find your local partner within 
Schaffner‘s global network, please go to 
www.schaffner.com 
 

®

 2014 Schaffner Group 

 
The content of this document has been 
carefully checked and understood. 
However, neither Schaffner nor its 
subsidiaries assume any liability 
whatsoever for any errors or 
inaccuracies of this document and the 
consequences thereof. Published 
specifications are subject to change 
without notice. Product suitability for any 
area of application must ultimately be 
determined by the customer. In all 
cases, products must never be operated 
outside their published specifications. 
Schaffner does not guarantee the 
availability of all published products. 
This disclaimer shall be governed by 
substantive Swiss law and resulting 
disputes shall be settled by the courts at 
the place of business of Schaffner 
Holding AG. Latest publications and a 
complete disclaimer can be downloaded 
from the Schaffner website. All 
trademarks recognized. 

Содержание Ecosine FN34 Series

Страница 1: ...Maintenance Manual Passive Harmonic Filters Ecosine Full Performance HV Line Frame Size Small...

Страница 2: ...ion 01 May 2018 The most current edition of these instructions PDF format can be obtained from your contact of the Schaffner organization Other technical documentation of our products is also availabl...

Страница 3: ...mmissioned They increase the reliability and service life of electric installations help utilize electric system capacity better and are the key to meet Power Quality standards such as IEEE Std 519 20...

Страница 4: ...has to be carried out by a trained and certified electrician or technician who is familiar with installation and safety procedures in three phase power systems Warning High voltage potentials are inv...

Страница 5: ...al block 10mm 2 34 safety terminal block 25mm 2 35 safety terminal block 50mm 2 40 safety terminal block 95mm 2 44 safety terminal block 6mm 2 53 safety terminal block 16mm 2 99 copper bus bars in dif...

Страница 6: ...Schaffner International Maintenance Manual Ecosine Full Performance HV Line Frame Size Small May 2018 6 19 1 Frame Size Small Valid for FN3410HV xx xxx...

Страница 7: ...rame Size Small May 2018 7 19 2 Maintenance Schedule Year after start operation Maintenance job 1 2 3 4 5 6 7 8 9 10 11 12 Check and clean fans air flow area Check el value of capacitors Replace Fan M...

Страница 8: ...ice ensure that it is switched off disconnected from the grid and capacitors are discharged Check and clean fans air flow area 1 Tool List CLEANING MATERIAL LIST 1 Gloves 2 Brush 3 Cleaning paper 4 Al...

Страница 9: ...n Dismantling process Remove the 2 screws with a socket wrench and a 5 5 mm socket and remove the cover Remove the 4 screws with a socket wrench and a 5 5 mm socket and open the fan module After remov...

Страница 10: ...he heat exchange area from both side with the brush and cleaning paper with alcohol 3 Work instruction Reassembly process Mount the fan module and tighten the 4 screws with a torque wrench and a 5 5 m...

Страница 11: ...t MAINTENANCE TOOL LIST 1 Socket wrench set 2 Torque wrench 3 Screw driver set 4 Combination wrench set 5 Pliers set 6 Multimeter with capacitance test for example Fluke 175 2 Work instruction Dismant...

Страница 12: ...nd the BLACK probe to the capacitor Compare the result with the expected value of the capacitor Attention If the result is less than 10 contact Schaffner Service 3 Work instruction Reassembly process...

Страница 13: ...ist MAINTENANCE TOOL LIST 1 Socket wrench set 2 Torque wrench 3 Screw driver set 4 Combination wrench set 5 Pliers set 6 Multimeter with capacitance test for example Fluke 175 2 Spare Parts Spare part...

Страница 14: ...Manual Ecosine Full Performance HV Line Frame Size Small May 2018 14 19 Disconnect the fan cable and remove the fan module Replace the fan module 4 Work instruction Reassembly process Connect the fan...

Страница 15: ...en the 4 screws with a torque wrench and a 5 5 mm socket with 1 7 Nm Replace capacitor module 1 Tool List MAINTENANCE TOOL LIST 1 Socket wrench set 2 Torque wrench 3 Screw driver set 4 Combination wre...

Страница 16: ...Small May 2018 16 19 3 Work instruction Dismantling process Remove the 2 screws with a socket wrench and a 5 5 mm socket and remove the cover Disconnect all cables bridges from the capacitors Remove t...

Страница 17: ...ace the capacitor 4 Work instruction Reassembly process Place the new capacitors tighten the nuts with a torque wrench and a 18 mm socket with 10 Nm use the new cable tie for the fixation of the capac...

Страница 18: ...chaffner International Maintenance Manual Ecosine Full Performance HV Line Frame Size Small May 2018 18 19 Mount the cover and tighten the 2 screws with a torque wrench and a 5 5 mm socket with 1 7 Nm...

Страница 19: ...in Schaffner s global network please go to www schaffner com 2014 Schaffner Group The content of this document has been carefully checked and understood However neither Schaffner nor its subsidiaries...

Отзывы: