Schaffner International
Maintenance Manual
Ecosine
®
Full Performance HV Line
– Frame Size Small
May 2018
7/19
2. Maintenance Schedule
Year after start
operation
Maintenance job
1
2
3
4
5
6
7
8
9
10
11
12
Check and clean fans / air flow area
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
Check el. value of capacitors
✓
✓
✓
✓
✓
✓
Replace Fan Module
✓
✓
Replace capacitor module
✓
Table 1: Maintenance schedule Frame Size Small