Mounting
Before mounting the device, check for any external damage.
If damage or some other defect is found, the device must not be
commissioned. In case of doubt, please contact Schaeffler
Technologies AG & Co. KG.
Note
Only suitable tools may be used, such as tools with voltage
insulation. Use the tool correctly.
Mounting procedure
In mounting, the following operations must be carried out:
■
identification of the measurement position of the sensor head
and the mounting position of the electronic evaluation system
■
if GreaseCheck is the only user of the CAN bus:
– tighten the four screws in the housing cover of the electronic
evaluation system (tightening torque 1,5 Nm)
■
if GreaseCheck is not the only user of the CAN bus:
– deactivate the 120 ohm resistor by changing the jumper
on the circuit board of the evaluation unit,
Figure 2
. Then close
the electronic evaluation system as described above.
■
mounting of the electronic evaluation system and laying of
the connection cable
■
mounting of the sensor head at the measurement position and
laying of the sensor connection cable
■
connection of the sensor connection cable to the electronic
evaluation system
■
connection of the connection cable for the electronic evaluation
system to the infrastructure according to the plan,
Figure 4
,
page 13
■
commission the GreaseCheck.