
#BIO10 11 – 140813
Page 11 of 40
6.
Installation Instructions
General Installation Instructions:
The Scanjet BIO 10 cleaning machine is
designed to be installed in a vertical upright or inverted position, however, the
machine may operate horizontally or in any other desired position.
Supply line:
Scanjet recommends to install a 100 micron fi lter in the supply
line in order to avoid large particles lodging inside the machine. All supply lines
should be fl ushed to remove dirt and particles before connecting the machine
to the system.
Cleaning Media:
Only media compatible with the materials listed in the
reference list of parts for your model should be used. See “4. Technical Data”
on page 7.
After Use Cleaning:
Depending on the type of cleaning that has been
performed and the type of cleaning media used, a procedure for after use
fl ushing of the cleaning system should be developed for your application. In
general, a fresh water fl ush is recommended after each cleaning.
Pressure:
Hydraulic shocks may damage the system. In order to avoid shocks
increase pressure gradually from 0 to maximum operating pressure over 5-7
seconds. Do not exceed 12 Bar (180 PSI) inlet pressure! Higher pressure in
combination with higher fl ow rates will increase consumption of wear parts and
result in major leakage.
NOTE!
The machine is only self-draining if installed in a vertical
position, upright or inverted.
Warning!
If the machine is
used in potentially explosive
atmospheres
then tapes or joint sealing compounds, which are
electrical insulators, must not be used on threads or joints, unless an
electrical connection is otherwise established to ensure an effective
grounding. In addition, connection pipe work must be electrically
conductive and grounded to the tank structure.
This is important in
order to avoid any build up of static electricity in the machine.
Содержание BIO 10
Страница 27: ... BIO10 11 140813 Page 27 of 40 25 25264 1 Gearbox Housing AISI 316L 26 25272 TX 1 Worm Gear PEEK TX ...
Страница 35: ... BIO10 11 140813 Page 35 of 40 Date No of working hours Maintenance Actions Exchanged Parts Sign ...
Страница 38: ......
Страница 39: ... BIO10 11 140813 Page 39 of 40 ...