Installation
34 Arium
®
Smart Station Operating Instructions
5.3 Unpacking and Installing the Device
CAUTION
Danger of electrical shock due to leaking water!
Water may spill when using the device. If the water comes into contact with
electrical devices, this may cause electric shocks.
t
Do
not
place the device in the immediate vicinity of electrically powered
devices.
CAUTION
Danger of body parts being crushed when installing the device due to
careless handling!
People could be injured if the device falls down.
t
Lift the device by the stand support rod and the control unit at the same
time.
We recommend that installation and commissioning of the device should
be carried out by Sartorius Service.
Procedure
t
Please contact Sartorius Service.
t
We recommend keeping the original packaging in case the device needs
to be returned or repaired, e.g., for repairs.
5.4 Installing the Stand Support Rod (Only for
Dispensing Unit with Stand)
Required tools: Torx screwdriver, size TX 20 (not included in the scope of
delivery)
Requirements
The stand support rod is installed on the right side.
Procedure
t
Remove the hand-held part from the stand arm and place next to the
device.
t
Remove the stand arm: Hold down the adjustment key and at the same
time pull the stand arm upwards off the stand support rod.
1
Содержание Arium H2O-ARST-P-B
Страница 2: ......
Страница 74: ...Conformity Documents 74 Arium Smart Station Operating Instructions...
Страница 75: ...Conformity Documents Arium Smart Station Operating Instructions 75...