PLV-HD2000 Basic Serial Command Functional Specifications
16/24
7.3 Status Read Command
COMMAND
“CR0” [CR]
Detail
Get the projector status
Acceptable “%1”
[CR]
%1
“00” = Power ON
“80” = Standby
“40” = Countdown in process
“20” = Cooling Down in process
“10” = Power Failure
“28” = Cooling Down in process due to Abnormal Temperature
“02” = RS-232C Command cannot be accepted
“24” = Power Management / Cooling Down in process
“04” = Power Management mode
“21” = Cooling Down in process after turn-off due to lamp failure
“81” = Standby after Cooling Down due to lamp failure
Response
Unacceptable “?” [CR]
【
Details for Response
】
・
“00” [CR]
Status: Power ON
Image is projected normally on screen.
・
“80” [CR]
Status: Standby
When the status is Standby, Status Read Commands are always accepted, while
Functional Execution Commands are not accepted except POWER ON command.
・
“40” [CR]
Status: Countdown in process
When “Display” in the Setting menu is set to ON, executing Power ON starts countdown
operation.
When “Display” in the Setting menu is set to OFF, the status moves to Immediate Power
ON status.
・
“20” [CR]
Status: Cooling Down in process
When the status is Power ON and then POWER OFF command is executed, it moves to
Cooling Down status.
Cooling Down status automatically moves on to Standby status in about 90 seconds of
fan spinning after the lamp is turned off. The fan spinning time varies according to PJ
models.
During this time, Functional Execution Commands are invalid.