Procedure Outline to Operation
19
§
§
8
8
.
.
P
P
r
r
o
o
c
c
e
e
d
d
u
u
r
r
e
e
U
U
n
n
t
t
i
i
l
l
L
L
o
o
a
a
d
d
D
D
e
e
v
v
i
i
c
c
e
e
O
O
p
p
e
e
r
r
a
a
t
t
i
i
o
o
n
n
The procedure outline until turning on the load devices is as follows.
Be sure to follow the procedure outline below to backup the load devices during power outage.
Check the default value of the user setting
⇒
pages 20 and 30 to 31
Perform the power outage simulation test
⇒
page 22
Start up the UPS
⇒
page 25
The backup function is available during power outage.
Test result: OK
Test result: NG
See “If power outage simulation test does not
finish properly, check the following points.” to
perform countermeasure.
⇒
page 23
Configure the user setting
⇒
User settings Guide
Charge the UPS
⇒
page 21
Connect the load devices
⇒
page 24
Turn on the load device power
⇒
page 26
When you do not change
the user setting, proceed
to next step.
When the default settings do not
configurate with your environment or
requirements, change the user settings.