Optional Equipment
50
§
§
1
1
8
8
.
.
2
2
.
.
2
2
L
L
i
i
n
n
k
k
e
e
d
d
O
O
p
p
e
e
r
r
a
a
t
t
i
i
o
o
n
n
O
O
N
N
P
P
r
r
o
o
c
c
e
e
d
d
u
u
r
r
e
e
①
Check to be sure that all LEDs on all UPS units are
off.
②
Press the “ON” button on the remote switch and
hold it down for at least 2 seconds.
The UPS units start the linked operation ON sequence. After the specified
time the system enters the operating state.
§
§
1
1
8
8
.
.
2
2
.
.
3
3
L
L
i
i
n
n
k
k
e
e
d
d
O
O
p
p
e
e
r
r
a
a
t
t
i
i
o
o
n
n
O
O
F
F
F
F
P
P
r
r
o
o
c
c
e
e
d
d
u
u
r
r
e
e
①
Check that “Green OUTPUT” lit
for all UPS units.
②
Press the “OFF” button on the remote switch and
hold it down for at least 2 seconds.
The UPS units start the linked operation OFF delay sequence,
and stop after the specified time.
“Green ON/OFF” blinks during the linked operation OFF delay sequence.
Be sure to keep the remote
switch button pressed for at
least 2 seconds.
Note
Linked operation starts or stops on an ON/OFF operation on the remote switch.
It does not start or stop on an ON/OFF operation with the
switch on the front panel.
Note about linked operation
Press “ON” for at least 2 seconds
LEDs
Green ON/OFF
Blinking
The “Green ON/OFF” blinks during
the linked operation ON delay
sequence.
The “Green ON/OFF” lights when
the system enters the operating
state. The state of the other LEDs
varies depending on load capacity
and UPS operating status.
The state of the other LEDs varies
depending on load capacity and
UPS operating status.
LED
Green ON/OFF
Lit
Green OUTPUT
Lit
Green INVERTER
Lit
Press “OFF” for at least 2 seconds
Check that “Green OUTPUT” lit
All of the
LEDs are off.
Be sure to keep the remote
switch button pressed for at
least 2 seconds.
Note
LED
Green ON/OFF
Lit
Green OUTPUT
Lit
Green INVERTER
Lit