
Maintenance Procedures
SY75C Excavator OMM
5-86
Operation and Maintenance Manual — 0220
SANY
Track Bolts - Check
NOTE:
This section applies only to those machines with metal track.
1. Ensure that all track bolts are properly in place at each
pair of track shoes (a) and not broken, bent, damaged or
loose.
2. Replace any bolts that are broken, bent or damaged.
3. Re tighten any bolts that are loose.
NOTE:
Tighten the bolts in sequence (b), ensuring that
the nuts and track shoe are in close contact
with the link mating surface.
Track Tension - Check and Adjust
Track Tension - Check
NOTE:
With new rubber track, check track tension between 5-30 hours of usage to make sure the track does
not come off the machine.
1. Clean the track, rollers and frame of accumulated dirt, mud and other debris.
2. Travel forward two machine lengths on a flat, level surface.
Fig. 5-140
a
1
4
2
3
Fig. 5-141
b
Содержание SY75
Страница 1: ...service sanyamerica com SANY Part Number SSY005081688 SY75 Excavator Operation and Maintenance Manual ...
Страница 2: ......
Страница 70: ...Monitor SY75C Excavator OMM 3 32 Operation and Maintenance Manual 0220 SANY This Page Intentionally Left Blank ...
Страница 223: ...This Page Intentionally Left Blank ...