52
ENGLISH
16.3.5. Controller reconfi guration required to manage external fi lter module FB-CA HE or FBL-HE
17. RESET THE CORRIGO CONTROLLER
In some cases, after several adjustments or due to a bad working, it could be necessary to reset the
controller. After isolating the unit and switching-off the main switch, open the door which gives access
to the electronic board. Remove all the connectors attached to the controller with the exception of the
4-way electrical supply green plug connected to terminals 1,2, Earth and 4.
A 05 95
A 04 94
A 03 93
A 02 92
A 01 91
Agnd 90
DI 8 78
DI 7 77
DI 6 76
DI 5 75
DI 4 74
DI 3 73
DI 2 72
E 63
Ext.
Disp.
N 62
A 61
B 60
E 53
P
1
A 51
B 50
P
2
P 1 Rx
Tx
P 2 Rx
Tx
TCP / IP
P / B
N 52
DI 1 71
TCP / IP
45 UI4
44 UI3
43 Agnd
42 UI2
41 UI1
40 A
GND
35 AI4
34 AI3
33 Agnd
32 AI2
31 UI
1
30 Agnd
17 D07
16 D06
15 D05
14 D04
13 D03
12 D02
11 D01
10 GD0
4 +C
2 G0
-
1 G
+
TCP / IP
45 UI4
44 UI
3
43 Agnd
42 UI
2
41 UI1
40 A
GND
35 AI4
34 AI3
33 Agnd
32 AI2
31 UI1
30 Agnd
17 D07
16 D06
15 D05
14 D04
13 D03
12 D02
11 D01
10 GD0
4 +C
2 G0
-
1
G+
A 05 95
A 04 94
A 03 93
A 02 92
A 01 91
Agnd 90
DI 8 78
DI 7 77
DI 6 76
DI 5 75
DI 4 74
DI 3 73
DI 2 72
E 63
Ext.
Disp.
N 62
A 61
B 60
E 53
P
1
A 51
B 50
P
2
P 1 Rx
Tx
P 2 Rx
Tx
TCP / IP
P / B
N 52
DI 1 71
With a screwdriver, release the controller from the DIN rail on which it is mounted.
To reset the controller, it must be under voltage so re-energise the CADB/T-HE at the isolator and also
on the unit by switching back on the main switch.
Содержание CADB/T-HE PRO-REG Series
Страница 1: ...CADB T HE PRO REG EN...
Страница 2: ......
Страница 48: ...48 ENGLISH 16 3 1 Controller recon guration required to manage coil module BA AF HE only as cooling coil...
Страница 63: ...63 23 WIRING DIAGRAMS 23 1 MAIN UNIT...
Страница 64: ...64...
Страница 65: ...65...
Страница 66: ...66...
Страница 67: ...67...
Страница 68: ...68...
Страница 69: ...69...
Страница 70: ...70 23 2 REWIRING TO MANAGE EXTERNAL MODULES Accessories...
Страница 71: ...71...