3
ENGLISH
INDEX
1. INTRODUCTION ..........................................................................................................................................................5
2. SAFETY REGULATIONS AND “CE” MARKING ............................................................................................................5
3. GENERAL INSTRUCTIONS .........................................................................................................................................5
4. UNIT LABELLING .......................................................................................................................................................5
5. HANDLING ..................................................................................................................................................................6
6. INSTALLATION ............................................................................................................................................................7
6.1.
Introduction..........................................................................................................................................................7
6.1.1. Outdoor installation .................................................................................................................................11
6.2. Dimensions and free space for maintenance ...................................................................................................12
6.3. Mounting process of an additional supply fi lter ................................................................................................14
6.4. Range specifi cations ..........................................................................................................................................14
6.5.
Connections
.......................................................................................................................................................15
6.5.1. Piping and duct connections ....................................................................................................................15
6.5.1.1. Connection with air duct .............................................................................................................15
6.5.1.2. Connecting the water coil piping. DC Versions ..........................................................................15
6.5.1.3. Condensate drainage ..................................................................................................................16
6.5.2. Electrical connection ...............................................................................................................................16
6.5.2.1. External Touch Display (ETD) control connection ......................................................................16
6.6.
Confi gurations ...................................................................................................................................................17
7. CONTROL FUNCTIONS .............................................................................................................................................19
8. CONTROL SCHEME ..................................................................................................................................................20
9. REMOTE CONTROL OPERATION ..............................................................................................................................21
9.1. Change language ...............................................................................................................................................21
9.2.
Simplifi ed menus / accesses .............................................................................................................................22
9.2.1. User level .................................................................................................................................................22
9.2.2. Installer level ...........................................................................................................................................22
9.3. Operation modes ...............................................................................................................................................24
9.3.1. Constant airfl ow operation (CAV) .............................................................................................................24
9.3.2. Variable airfl ow operation (VAV) ..............................................................................................................27
9.3.3. Constant pressure operation (COP) .........................................................................................................28
9.4. Postheater control .............................................................................................................................................32
9.4.1. Constant supply air temperature maintenance ......................................................................................32
9.4.2. Constant ambient temperature maintenance .........................................................................................32
9.4.3. Temperature set point adaptation vs. outdoor temperature ...................................................................33
9.4.4. Automatic control mode ..........................................................................................................................33
9.5. Initial temperature setpoint ..............................................................................................................................33
9.6. Time programming ............................................................................................................................................34
10. BOOST FUNCTION (ONLY AVAILABLE IN CAV AND COP MODES) ...........................................................................36
11. REMOTE STOP-START ..............................................................................................................................................37
12. FREE COOLING BY NIGHT ........................................................................................................................................37
13. WATER HEATER FROST PROTECTION ......................................................................................................................39
14. PROTECTION OF HEAT EXCHANGER UNIT ..............................................................................................................40
15. FIRE FUNCTION (FIRE) .............................................................................................................................................40
16. CONTROL OF COOLING EXTERNAL BATTERIES ......................................................................................................41
16.1. Accesssories assembly ....................................................................................................................................42
16.2. Wiring between accessory and PRO-REG electrical board .............................................................................45
16.2.1. Coil module BA-AF HE, BA-AFC HE, BA-DX .........................................................................................45
16.2.2. Filtration modules FBL-CA HE y FBL-HE .............................................................................................46
16.3. Control reconfi guration ...................................................................................................................................47
16.3.1. Controller reconfi guration required to manage coil module BA-AF HE only as cooling coil ...............48
16.3.2. Controller reconfi guration required to manage coil module BA-AF HE as reversible coil
(cooling and heating)..............................................................................................................................49
16.3.3. Controller reconfi guration required to manage coil module BA-AFC HE in 4 pipes systems
(cooling and heating)..............................................................................................................................50
16.3.4. Controller reconfi guration required to manage DX coil module BA-DX HE (cooling and heating) ......51
16.3.5. Controller reconfi guration required to manage external fi lter module FB-CA HE or FBL-HE ............52
ENGLISH
Содержание CADB/T-HE PRO-REG Series
Страница 1: ...CADB T HE PRO REG EN...
Страница 2: ......
Страница 48: ...48 ENGLISH 16 3 1 Controller recon guration required to manage coil module BA AF HE only as cooling coil...
Страница 63: ...63 23 WIRING DIAGRAMS 23 1 MAIN UNIT...
Страница 64: ...64...
Страница 65: ...65...
Страница 66: ...66...
Страница 67: ...67...
Страница 68: ...68...
Страница 69: ...69...
Страница 70: ...70 23 2 REWIRING TO MANAGE EXTERNAL MODULES Accessories...
Страница 71: ...71...