L
N
Brown = LA
Red = LB
White = LC
Blue = N
Brown = LA
Red = LB
White = LC
Blue = N
L
N
L
N
Brown = LA
Red = LB
White = LC
Blue = N
CR-150
4
1
5
2
6
3
fig.B
fig.B
fig.C
L
N
Brown = LA
Red = LB
White = LC
Blue = N
L
N
Brown = LA
Blue = N
l
ll
6
1
5
2
3
CR-150
C
B
A
N
HV
HV-150 A E
HV-230 A E / HV-300 A E + CR-150
N
A
B
C
Común
Apertura
Extracción
Impulsión
Neutral
Open
Extract
Intake
Neutre
Ouverture
Extraction
Insufflation
Neutro
Aberto
Extracção
Insuflação
Nulleiter
Offen
Entlüftung
Belüftung
Neutraal
Åben
Afvoer
Toevoer
Nulleiter
Aperto
Udsugning
Indblæsning
Przewód wspólny
Otwarty
Estrazione
Pressione
Wylot
Wlot
ATENCIÓN: Debe cambiarse el puente de los bornes 5-1 a 5-2.
CAUTION: The connection bridge must be changed from 5-1 to 5-2.
ATTENTION: Le pontage entre 5 et 1 doit être placé entre 5 et 2.
ATENÇÃO: Deve trocar-se a ponte dos bornes 5-1 para 5-2.
ACHTUNG: Die Überbrückung von Klemme 5-1 auf Klemme 5-2 legen.
LET OP: de doorverbinding moet gewijzigd worden van 5-1 naar 5-2.
BEMÆRK: “Luse” skal flytte fra 5-1 til 5-2.
ATTENZIONE: Bisogna cambiare il ponte dai terminal 5 -1 a 5-2.
UWAGA: Poùàczenie musi byã zienione z 5-1 na 5-2.
Extracción
Impulsión
Extract
Intake
Extraction
Insufflation
Extracção
Insuflação
Entlüftung
Belüftung
Afvoer
Toevoer
Udsugning
Indblæsning
Estrazione
Pressione
Wylot
Wlot