S&C Instruction Sheet 1042-511
5
Installation
This instruction sheet was prepared for use with the IntelliTeam
®
II Automatic
Restoration System and 5800 Series software: SNCD2B1X Rev. 2.43, SNCD2B6D Rev. 2.43,
PADD2B1X Rev. 2.43, VISD2B1X Rev. 2.43, and USBD2B1X Rev. 2.43.
The revision number is on the
Troubleshooting>Control & Switch Information
screen.
For questions regarding the applicability of information in this instruction sheet to future
product releases, please contact S&C Electric Company.
WARNING
These instructions do not replace the need for utility operation standards . Any conflict
between the information in this document and utility practices should be reviewed by
appropriate utility personnel and a decision made as to the correct procedures to follow .
Serious risk of personal injury or death may result from contact with electric
distribution equipment when electrical isolation and grounding procedures are not
followed . The equipment described in this document must be operated and maintained
by qualified persons who are thoroughly trained and understand any hazards that
may be involved . This document is written only for such qualified persons and is not a
substitute for adequate training and experience in safety procedures for accessing
high-voltage equipment .
S&C 5800 Series Controls are connected to switchgear operating at primary voltage
levels . High voltage may be present in the wiring to the switch control or in the switch
control itself during certain switchgear wiring or grounding system failures, or due to a
problem with the switch control itself . For this reason, access to switch controls should
be treated with the same safety precautions that would be applied when accessing
other high-voltage lines and equipment . Follow all locally approved safety procedures
when working on or around this control .
Before attempting to access an existing switch installation, check carefully for
visible or audible signs of electrical or physical malfunction (do this before touching or
operating the switch control or any other part of the installation) . These warning signs
include smoke, fire, open fuses, crackling noises, loud buzzing, etc . If a malfunction
is suspected, treat all components of the installation, including the switch control and
associated mounting hardware, as if they were elevated to primary (high) voltage .
Whenever you manually reconfigure the circuit (for example, during repairs),
follow your company’s operating procedures to disable automatic operation of the
switch control . This will prevent any unexpected operation .
NOTICE
All switch controls in your IntelliTeam system must use the same software revision .
Revision 2 .43 should be installed only in 5800 Series Switch Controls manufactured
after January 1, 2005, or in older controls that have had the 4-layer processor board
(006-001053-01 or 006-001053-02) retrofitted . Using Revision 2 .43 with the ear-
lier 2-layer boards may result in memory corruption . If you need assistance, or your
equipment requires the upgrade, please contact S&C Electric Company .
Applicable Software
Содержание 5800 Series
Страница 27: ...S C Instruction Sheet 1042 511 27 Installation Diagrams...
Страница 28: ...28 S C Instruction Sheet 1042 511 Installation Diagrams...
Страница 29: ...S C Instruction Sheet 1042 511 29 Installation Diagrams...
Страница 30: ...30 S C Instruction Sheet 1042 511 Installation Diagrams...
Страница 31: ...S C Instruction Sheet 1042 511 31 Installation Diagrams...
Страница 32: ...32 S C Instruction Sheet 1042 511 Installation Diagrams...
Страница 33: ...S C Instruction Sheet 1042 511 33 Installation Diagrams...
Страница 34: ...34 S C Instruction Sheet 1042 511 Installation Diagrams...
Страница 35: ...S C Instruction Sheet 1042 511 35 Installation Diagrams...
Страница 36: ...36 S C Instruction Sheet 1042 511 Installation Diagrams...
Страница 37: ...S C Instruction Sheet 1042 511 37 Installation Diagrams...
Страница 38: ...38 S C Instruction Sheet 1042 511 Installation Diagrams...