background image

  

  INSTRUCTION SHEET

  

716-600

Page 7 of 24

February 11, 2002

S&C ELECTRIC COMPANY

Interrupter
lifting bracket

¹⁄₂

—13

1

¹⁄₄

 

hex-head
stainless-steel 
cap screws and 
Belleville
washers

Four 

¹⁄₂

—13

stainless-steel
hex nuts and 
Belleville
washers

Four 

⁵⁄₁₆

—18

³⁄₄

 

hex-head
stainless-steel 
cap screws

Access cover

Transition box 

Insulating support 
column

INTERRUPTER REPLACEMENT ON MODELS 2020, 2025, AND 2030  — Continued

Step 4

Remove the four 

⁵⁄₁₆

—18

³⁄₄

 hex-head stainless-steel

cap screws used to attach the access cover to the side of
the transition box on the insulating support column. See
Figure 4. Remove the cover and place it and the hardware
on a clean surface. They will be re-used in Step 11(f).

Step 5 

Prepare the interrupter for removal from the insulating
support column as follows. For Circuit-Switchers rated 69
kV through 138 kV, refer to Figure 5 (top); for Circuit-
Switchers rated 161 kV and 230 kV, refer to Figure 5
(bottom).

(a) Attach the spare stop bracket (marked with a

black/yellow striped label) and spacer (marked with a
black/yellow striped label) to the interrupter using the

⁵⁄₁₆

—18

2

¹⁄₄

 hex-head stainless-steel screw fur-

nished. (These items are included with the replace-
ment interrupter, in a separate box.) Hand-tighten the
screw.

(b) Remove the pin retaining clip and connecting pin

which attach the coupling to the operating rod link.
Discard the connecting pin and pin retaining clip. 

(c) Now securely tighten the 

⁵⁄₁₆

—18

2

¹⁄₄

 hex-head

stainless-steel screw.

Step 6 

Attach a suitable lifting sling to the interrupter lifting
bracket. Then remove the four 

¹⁄₂

—13 stainless-steel hex

nuts and Belleville washers which attach the interrupter
to the transition box on the insulating support column.
See Figure 4. Retain this hardware for re-use in
Step 11(c).

Step 7

Carefully lift the interrupter from atop the transition box
of its associated insulating support column and lower it
to the ground. Place the interrupter on the ground
horizontally. 

Use care to avoid damaging the exposed

coupling.

Ç

 

CAUTION

 

Do not lift interrupter vertically by the lifting rings on
the container.

Figure 4. Removing access cover from transition box. 

Содержание 2000 series

Страница 1: ...e containing sulfur hexafluoride SF6 gas under pressure It employs an operating rod which is driven to the open position at high speed by means of a power train connected to the Series 2000 Circuit Sw...

Страница 2: ...binet of the circuit switcher using the instruction manual holder Proper Application Warranty The standard warranty contained in S C s standard con ditions of sale as set forth in Price Sheet 150 is a...

Страница 3: ...ffice S C Authorized Distributor S C Headquarters or S C Electric Canada Ltd It is important that any missing damaged or faded labels on the equipment be replaced immediately Replacement labels are av...

Страница 4: ...of loss and or damage Packing The Series 2000 Circuit Switcher interrupter is a porce lain enclosed hermetically sealed device containing sulfur hexafluoride SF6 gas under pressure 75 PSI To guard aga...

Страница 5: ...ound the interrupter to be replaced using the following procedure a Remove the two container halves from the shipping crate Note that one of the container halves is fur nished with a loosely attached...

Страница 6: ...r forth as necessary to allow the cable to be threaded through the holes g Pull the cable taut at the indicator end of the inter rupter and attach two of the clamps furnished See Figure 3 right Secure...

Страница 7: ...ith a black yellow striped label and spacer marked with a black yellow striped label to the interrupter using the 18 2 hex head stainless steel screw fur nished These items are included with the repla...

Страница 8: ...d link Pin retaining clip 18 2 hex head stain less steel screw Stop bracket marked with a black yellow striped label 18 2 hex head stain less steel screw Coupling Slot coincides with cross hole Spacer...

Страница 9: ...n box on the insulating support column Use care to avoid damaging the exposed coupling Step 10 Prepare the replacement interrupter for attachment to the insulating support column as follows a Remove a...

Страница 10: ...38 kV Insert the connecting pin retained from Step 10 c into the coupling and operating rod link See Figure 5 top It will be necessary to loosen the 18 2 hex head stainless steel screw indicated in Fi...

Страница 11: ...wo 16 1 and one 16 zinc plated hex head cap screws and flat washers which attach one of the container halves to the indicator end casting of the interrupter Don t remove the remaining 16 cap screw it...

Страница 12: ...ise the container into position around the interrupter d Using a screwdriver as necessary to spread the edges snap the two halves together as shown in Figure 3 Place a 16 zinc plated serrated hex nut...

Страница 13: ...cover to the side of the transition box on the insulating support column See Figure 10 Remove the cover and place it and the hardware on a clean surface They will be re used in Step 31 Step 21 Prepar...

Страница 14: ...rate Step 26 Remove the interrupter lifting bracket and associated inch stainless steel hardware from the end of the replacement interrupter This bracket is not used in the interrupter replacement pro...

Страница 15: ...ing slings to the replacement inter rupter and carefully lift and slide the interrupter into posi tion Use care to avoid damaging the exposed operating rod Thoroughly wire brush the mating surfaces on...

Страница 16: ...draw it approximately inch so that the connect ing pin can be inserted Do not remove the screw at this time Now insert the pin retaining clip retained from Step 28 as indicated in Figure 13 left Make...

Страница 17: ...e provided so that a rope or lifting sling can be attached and the container half more conveniently lowered to the ground d Now remove and discard the 16 hex head cap screw and flat washer which attac...

Страница 18: ...cable Do not remove the shorting plug from the end of the green 6 pin connector at this time See Figure 14 Step 38 On Circuit Switchers with vertical interrupters Model 2020 Model 2025 and Model 2030...

Страница 19: ...he side of the operating rod that is towards the access opening Feeding the sensor cable from behind the operat ing rod may cause the cable to catch on the rod during switch operation See Figure 16 St...

Страница 20: ...nnector located on the red sensor cable Remove the shorting plug from the 6 pin socket on the transmitter circuit board Firmly plug the green 6 pin connector from the inter rupter into the green 6 pin...

Страница 21: ...e replaced Retain the jumper for future use in the pocket on the operator enclosure door NOTICE Save the shorting plugs and install them on the replaced interrupters When replacing an interrupter with...

Страница 22: ...perator door Step 46 Press and hold for 10 seconds the system set up button located on the right side of the receiver See Figure 20 The receiver unit will start to count down See Figure 21 Release the...

Страница 23: ...nce every hour When the magnet tool is applied to transmitter the transmitter is prompted to send a signal to the receiver once every second The transmitter will continue to send this sig nal for up t...

Страница 24: ...esignations are not correct reprogramming of the receiver is required Repeat Steps 41 51 until the pole unit designations are appropriate for the installation NOTICE If the poles are not initialized i...

Отзывы: