background image

S&C ELECTRIC COMPANY

716-600 

INSTRUCTION SHEET

Page 24 of 24
February 11, 2002

S&C Series 2000 Circuit-Switchers

Interrupter Replacement

Outdoor Transmission (69 kV through 230 kV)

Step 49

After all three phases are initialized, the LCD will show
the three interrupter serial numbers in the order the
phases were initialized. The display will sequentially alter-
nate the messages shown in Figures 27a, 27b, and 27c.
Hold down the set-up button for 5 seconds.  This will clear
the previous settings from the receiver and save the new
settings.  When the update has been completed, the LCD
will display a “Release Button” prompt. Release the set-up
button.  The receiver will reboot. 

Step 50

Test the system by attaching the magnet tool to a hotstick
long enough to reach the transmitter. Hold the magnet
tool flush against the side of the transmitteras shown in
Figure 24. Repeat for each transmitter. Gas-density data
will be transmitted to the receiver and shown on the LCD.

Step 51

Check the pole-unit designations on the LCD, and that the
gas-density readings for all three phases are at 100%. If so,
installation is complete. If the pole-unit designations are
not correct, reprogramming of the receiver is required.
Repeat Steps 41–51 until the pole-unit designations are
appropriate for the installation.

NOTICE

 

If the poles are not initialized in the correct sequence,
wait for the receiver to time out and reboot. (Approxi-
mately 2 minutes.) Disconnecting power to the opera-
tor during set-up will also reboot the system.

After programming is complete, the display 

will

not

 indicate which interrupter/transmitter serial

number is associated with each phase again. Please
make a note of which interrupter/transmitter serial
number is associated with each phase for future
reference.

INTERRUPTERS WITH THE REMOTE GAS-DENSITY MONITOR OPTION — Continued

Check Serial Numbers
SS-0608-001
SS-0608-002
SS-0608-003

INSPECTION SCHEDULE AND PROCEDURES

To ensure Series 2000 Circuit-Switcher’s continued
proper performance, it should be inspected in accordance
with S&C’s recommended schedule and procedures
contained in S&C Instruction Sheet 716-590. 

If Serial Numbers
Are Correct Press &
Hold to Save Them

If Serial Numbers
Are Wrong, Wait For
Receiver To  Reset
And Do Setup Again.

Figure 27c. Receiver LCD after all three phases are initial-
ized.

Figure 27b. Receiver LCD after all three phases are initial-
ized.

Figure 27a. Receiver LCD after all three phases are initial-
ized. 

Pr

inted in U

.S

.A.

Содержание 2000 series

Страница 1: ...e containing sulfur hexafluoride SF6 gas under pressure It employs an operating rod which is driven to the open position at high speed by means of a power train connected to the Series 2000 Circuit Sw...

Страница 2: ...binet of the circuit switcher using the instruction manual holder Proper Application Warranty The standard warranty contained in S C s standard con ditions of sale as set forth in Price Sheet 150 is a...

Страница 3: ...ffice S C Authorized Distributor S C Headquarters or S C Electric Canada Ltd It is important that any missing damaged or faded labels on the equipment be replaced immediately Replacement labels are av...

Страница 4: ...of loss and or damage Packing The Series 2000 Circuit Switcher interrupter is a porce lain enclosed hermetically sealed device containing sulfur hexafluoride SF6 gas under pressure 75 PSI To guard aga...

Страница 5: ...ound the interrupter to be replaced using the following procedure a Remove the two container halves from the shipping crate Note that one of the container halves is fur nished with a loosely attached...

Страница 6: ...r forth as necessary to allow the cable to be threaded through the holes g Pull the cable taut at the indicator end of the inter rupter and attach two of the clamps furnished See Figure 3 right Secure...

Страница 7: ...ith a black yellow striped label and spacer marked with a black yellow striped label to the interrupter using the 18 2 hex head stainless steel screw fur nished These items are included with the repla...

Страница 8: ...d link Pin retaining clip 18 2 hex head stain less steel screw Stop bracket marked with a black yellow striped label 18 2 hex head stain less steel screw Coupling Slot coincides with cross hole Spacer...

Страница 9: ...n box on the insulating support column Use care to avoid damaging the exposed coupling Step 10 Prepare the replacement interrupter for attachment to the insulating support column as follows a Remove a...

Страница 10: ...38 kV Insert the connecting pin retained from Step 10 c into the coupling and operating rod link See Figure 5 top It will be necessary to loosen the 18 2 hex head stainless steel screw indicated in Fi...

Страница 11: ...wo 16 1 and one 16 zinc plated hex head cap screws and flat washers which attach one of the container halves to the indicator end casting of the interrupter Don t remove the remaining 16 cap screw it...

Страница 12: ...ise the container into position around the interrupter d Using a screwdriver as necessary to spread the edges snap the two halves together as shown in Figure 3 Place a 16 zinc plated serrated hex nut...

Страница 13: ...cover to the side of the transition box on the insulating support column See Figure 10 Remove the cover and place it and the hardware on a clean surface They will be re used in Step 31 Step 21 Prepar...

Страница 14: ...rate Step 26 Remove the interrupter lifting bracket and associated inch stainless steel hardware from the end of the replacement interrupter This bracket is not used in the interrupter replacement pro...

Страница 15: ...ing slings to the replacement inter rupter and carefully lift and slide the interrupter into posi tion Use care to avoid damaging the exposed operating rod Thoroughly wire brush the mating surfaces on...

Страница 16: ...draw it approximately inch so that the connect ing pin can be inserted Do not remove the screw at this time Now insert the pin retaining clip retained from Step 28 as indicated in Figure 13 left Make...

Страница 17: ...e provided so that a rope or lifting sling can be attached and the container half more conveniently lowered to the ground d Now remove and discard the 16 hex head cap screw and flat washer which attac...

Страница 18: ...cable Do not remove the shorting plug from the end of the green 6 pin connector at this time See Figure 14 Step 38 On Circuit Switchers with vertical interrupters Model 2020 Model 2025 and Model 2030...

Страница 19: ...he side of the operating rod that is towards the access opening Feeding the sensor cable from behind the operat ing rod may cause the cable to catch on the rod during switch operation See Figure 16 St...

Страница 20: ...nnector located on the red sensor cable Remove the shorting plug from the 6 pin socket on the transmitter circuit board Firmly plug the green 6 pin connector from the inter rupter into the green 6 pin...

Страница 21: ...e replaced Retain the jumper for future use in the pocket on the operator enclosure door NOTICE Save the shorting plugs and install them on the replaced interrupters When replacing an interrupter with...

Страница 22: ...perator door Step 46 Press and hold for 10 seconds the system set up button located on the right side of the receiver See Figure 20 The receiver unit will start to count down See Figure 21 Release the...

Страница 23: ...nce every hour When the magnet tool is applied to transmitter the transmitter is prompted to send a signal to the receiver once every second The transmitter will continue to send this sig nal for up t...

Страница 24: ...esignations are not correct reprogramming of the receiver is required Repeat Steps 41 51 until the pole unit designations are appropriate for the installation NOTICE If the poles are not initialized i...

Отзывы: