background image

  

  INSTRUCTION SHEET

  

716-600

Page 11 of 24

February 11, 2002

S&C ELECTRIC COMPANY

INTERRUPTER REPLACEMENT ON MODELS 2020, 2025, AND 2030  — Continued

(e) Now remove and discard the 

⁵⁄₁₆

—18

2

¹⁄₄

 hex-head

stainless-steel screw, stop bracket (marked with a
black/yellow striped label), and spacer (marked with a
black/yellow striped label) illustrated in Figure 5.

(f) Replace the access cover retained from Step 4 and

securely tighten the associated 

⁵⁄₁₆

—18

³⁄₄

 hex-head

stainless-steel cap screws.

Step 12

Remove the interrupter lifting bracket and associated

¹⁄₂

-inch stainless-steel hardware from atop the interrupter.

Discard the lifting bracket but retain the hardware.
Thoroughly wire-brush the indicator end casting where
the terminal pad is to be attached, as well as the mating
surface on the upper terminal pad, and immediately apply
a liberal coating of Penetrox A or other suitable
aluminum connector compound to the brushed surfaces.
Then attach the upper terminal pad using three

¹⁄₂

—13

1

¹⁄₄

 hex-head stainless-steel cap screws and

Belleville washers. Reconnect the high-voltage
conductor(s). 

Step 13

Remove the container from the replacement interrupter
as follows:

(a) Remove and discard the 

³⁄₈

—16 zinc-plated serrated

hex nuts which run the length of the container.

(b) Remove and discard the two 

³⁄₈

—16

1

 and two

³⁄₈

—16

⁷⁄₈

 zinc-plated hex-head cap screws and flat

washers which attach the two container-halves to the

coupling end casting

 of the interrupter.

(c) Remove and discard the two 

³⁄₈

—16

1

 and one

³⁄₈

—16

⁷⁄₈

 zinc-plated hex-head cap screws and flat

washers which attach 

one

 of the container-halves to

the 

indicator end casting

 of the interrupter. Don’t

remove the remaining 

³⁄₈

—16

⁷⁄₈

 cap screw—it’s

needed to temporarily retain the other container-half.

(d) Pry the container-halves apart with a screwdriver. One

of the container-halves can now be removed and dis-
carded—slotted holes are provided so that a rope or
lifting sling can be attached and the container-half
more conveniently lowered to the ground.

(e) Now remove and discard the remaining 

³⁄₈

—16

⁷⁄₈

hex-head cap screw and flat washer which attach the
other container-half. Then discard this container-half.

(f) Finally, remove and discard the foam-core inner liner

wrapped around the interrupter.

Step 14

Replace the trip-circuit and control-circuit fuseholders in
the operator or—on newer operators—close the control-
source disconnect switch and replace the motor-and-
closing circuit fuseholder. 

Step 15

Attach  lifting slings to the four lifting rings on the
replaced interrupter container. 

Do not

 loop slings from

one end of the container to the other. Carefully lift the
interrupter into the replacement interrupter shipping
crate. Secure the interrupter and close the lid. 

Step 16

Ship the replaced interrupter, transportation charges
prepaid, to S&C Electric Company, Repair Center, 1800
Devon Avenue, Chicago, Illinois 60660-1010. To ensure
proper handling, purchasers are asked to obtain from the
nearest S&C Sales Office a special serially numbered
label to place on the shipping crate. Please enclose a
packing slip showing purchase order or requisition
number covering the exchange.

Содержание 2000 series

Страница 1: ...e containing sulfur hexafluoride SF6 gas under pressure It employs an operating rod which is driven to the open position at high speed by means of a power train connected to the Series 2000 Circuit Sw...

Страница 2: ...binet of the circuit switcher using the instruction manual holder Proper Application Warranty The standard warranty contained in S C s standard con ditions of sale as set forth in Price Sheet 150 is a...

Страница 3: ...ffice S C Authorized Distributor S C Headquarters or S C Electric Canada Ltd It is important that any missing damaged or faded labels on the equipment be replaced immediately Replacement labels are av...

Страница 4: ...of loss and or damage Packing The Series 2000 Circuit Switcher interrupter is a porce lain enclosed hermetically sealed device containing sulfur hexafluoride SF6 gas under pressure 75 PSI To guard aga...

Страница 5: ...ound the interrupter to be replaced using the following procedure a Remove the two container halves from the shipping crate Note that one of the container halves is fur nished with a loosely attached...

Страница 6: ...r forth as necessary to allow the cable to be threaded through the holes g Pull the cable taut at the indicator end of the inter rupter and attach two of the clamps furnished See Figure 3 right Secure...

Страница 7: ...ith a black yellow striped label and spacer marked with a black yellow striped label to the interrupter using the 18 2 hex head stainless steel screw fur nished These items are included with the repla...

Страница 8: ...d link Pin retaining clip 18 2 hex head stain less steel screw Stop bracket marked with a black yellow striped label 18 2 hex head stain less steel screw Coupling Slot coincides with cross hole Spacer...

Страница 9: ...n box on the insulating support column Use care to avoid damaging the exposed coupling Step 10 Prepare the replacement interrupter for attachment to the insulating support column as follows a Remove a...

Страница 10: ...38 kV Insert the connecting pin retained from Step 10 c into the coupling and operating rod link See Figure 5 top It will be necessary to loosen the 18 2 hex head stainless steel screw indicated in Fi...

Страница 11: ...wo 16 1 and one 16 zinc plated hex head cap screws and flat washers which attach one of the container halves to the indicator end casting of the interrupter Don t remove the remaining 16 cap screw it...

Страница 12: ...ise the container into position around the interrupter d Using a screwdriver as necessary to spread the edges snap the two halves together as shown in Figure 3 Place a 16 zinc plated serrated hex nut...

Страница 13: ...cover to the side of the transition box on the insulating support column See Figure 10 Remove the cover and place it and the hardware on a clean surface They will be re used in Step 31 Step 21 Prepar...

Страница 14: ...rate Step 26 Remove the interrupter lifting bracket and associated inch stainless steel hardware from the end of the replacement interrupter This bracket is not used in the interrupter replacement pro...

Страница 15: ...ing slings to the replacement inter rupter and carefully lift and slide the interrupter into posi tion Use care to avoid damaging the exposed operating rod Thoroughly wire brush the mating surfaces on...

Страница 16: ...draw it approximately inch so that the connect ing pin can be inserted Do not remove the screw at this time Now insert the pin retaining clip retained from Step 28 as indicated in Figure 13 left Make...

Страница 17: ...e provided so that a rope or lifting sling can be attached and the container half more conveniently lowered to the ground d Now remove and discard the 16 hex head cap screw and flat washer which attac...

Страница 18: ...cable Do not remove the shorting plug from the end of the green 6 pin connector at this time See Figure 14 Step 38 On Circuit Switchers with vertical interrupters Model 2020 Model 2025 and Model 2030...

Страница 19: ...he side of the operating rod that is towards the access opening Feeding the sensor cable from behind the operat ing rod may cause the cable to catch on the rod during switch operation See Figure 16 St...

Страница 20: ...nnector located on the red sensor cable Remove the shorting plug from the 6 pin socket on the transmitter circuit board Firmly plug the green 6 pin connector from the inter rupter into the green 6 pin...

Страница 21: ...e replaced Retain the jumper for future use in the pocket on the operator enclosure door NOTICE Save the shorting plugs and install them on the replaced interrupters When replacing an interrupter with...

Страница 22: ...perator door Step 46 Press and hold for 10 seconds the system set up button located on the right side of the receiver See Figure 20 The receiver unit will start to count down See Figure 21 Release the...

Страница 23: ...nce every hour When the magnet tool is applied to transmitter the transmitter is prompted to send a signal to the receiver once every second The transmitter will continue to send this sig nal for up t...

Страница 24: ...esignations are not correct reprogramming of the receiver is required Repeat Steps 41 51 until the pole unit designations are appropriate for the installation NOTICE If the poles are not initialized i...

Отзывы: