S&C ELECTRIC COMPANY
716-600
INSTRUCTION SHEET
Page 20 of 24
February 11, 2002
S&C Series 2000 Circuit-Switchers
Interrupter Replacement
Outdoor Transmission (69 kV through 230 kV)
Step 41
Ground the transmitter to the transition box with the sup-
plied grounding strap. Clamp one end of the grounding
strap to the bottom of the transmitter housing, and the
other to the transition box. See Figure 17.
Step 42
With the transmitter and transition box grounded, firmly
plug the black, 2-pin connector from the battery into the
black 2-pin socket on the transmitter circuit board. When
properly installed, the locking tab on the connector will
face away from the battery. See Figure 18.
Step 43
Remove the shorting plug from the green 6-pin connector
located on the red sensor cable. Remove the shorting plug
from the 6-pin socket on the transmitter circuit board.
Firmly plug the green 6-pin connector from the inter-
rupter into the green 6-pin socket on the transmitter cir-
cuit board. See Figure 18.
NOTICE
Make sure the transmitter is fully grounded before
connecting the battery or sensor cables.
Static and/or
electrical discharge from the interrupter can
damage the transmitter circuit board and sensor
cable.
INTERRUPTERS WITH THE REMOTE GAS-DENSITY MONITOR OPTION — Continued
Figure 17. Attach one end of the grounding strap to the
transmitter housing, and the other end to the transition
box.
Figure 18. Plug the black 2-pin connector from the battery
into the black 2-pin socket on the transmitter circuit board.
Plug the green 6-pin connector from the interrupter into the
green 6-pin socket on the circuit board.
Green
6-pin
socket
Black 2-pin connector
Grounding strap