Main Inspection
Checklist
Evaluation Criteria
Inspection
Results
Pass
Fail
the state of the
bolts/nuts/washers
magnets if the tightening torque value
has been followed.
Insulation status
Check if there is any contact between
the insulators by performing an insulation
resistance test.
Other installation
components, such as
the cable duct
installation status
Locate and check each installation
status.
Grounding Grounding bar
installation status
Check the separation status of the
Outdoor AP/power/arrestor grounding.
Cable standards
Check if the standards have been
followed, such as thickness and so on.
Cable installation and
binding status
Check the damage/installed route/
bending radius of cables and the
materials used.
Cable connection
status
Check for the tightened and assembled
status of the pressure terminal and if the
tightening torque value has been met.
Cable tag installation
status
Check the location, labeling, and tag
installation method used.
Power
Supply
Power supply
equipment and circuit
breaker installation
status
Check the power supplying the
equipment's capacity/input voltage
(using a tester), and the circuit breaker's
type and capacity.
Cable standards
Check the thickness and limited distance
of the cables.
Cable installation and
binding status
Check the damage/installed
route/bending radius of cables and the
materials used.
Cable connection
status
Check the power connection status for
each cable according to the pin map
configuration.
Check the pressure terminal/connector's
assembly and tightened status to
determine if the tightening torque value
has been met.
Cable tag installation
status
Check the location, labeling, and tag
installation method used.
Other Data
Cables
Cable standards
Check the cable standards are correct
for each purpose.
Cable installation and
binding status
Check the damage/installed route/
bending radius of cables and the