3
.
Installing the Product
60
English 8/2020. Rev 0.3
17.
Connect Battery Module #7 B+ and Battery Module #8 B- using “BUS-BAR MAIN.” Connect using an M8 screw. Measure the
contact resistance between the terminal and the bus bar.
Figure 3-61: Connect Battery Module #7 B+ and Battery Module #8 B-
18.
Reattach Battery Modules #7’s front cover and remove Battery Modules #9’s front cover.
Figure 3-62: Reattach Battery Modules #7’s Front Cover
Содержание U6A4
Страница 1: ...English 8 2020 Rev 0 3 LIB System for UPS U6A4 Installation Manual 128S ...
Страница 4: ...English 8 2020 Rev 0 3 ...
Страница 10: ...Important Safety Instructions vi English 8 2020 Rev 0 3 ...
Страница 17: ...Table of Contents English 8 2020 Rev 0 3 vii ...
Страница 18: ......
Страница 60: ...3 Installing the Product 42 English 8 2020 Rev 0 3 Figure 3 33 Fuse Busbar Left Assembly Fuse Cover ...
Страница 79: ...3 Installing the Product English 8 2020 Rev 0 3 61 Figure 3 63 Remove Battery Modules 9 s Front Cover ...
Страница 116: ...3 Installing the Product 98 English 8 2020 Rev 0 3 Figure 3 126 AC Input Terminals of SMPS Assembly 1 Phase Type B ...
Страница 125: ...Memo ...
Страница 126: ...Memo ...
Страница 127: ...Memo ...
Страница 128: ...www SamsungSDI com ...