3
.
Installing the Product
26
English 8/2020. Rev 0.3
Figure 3-10: Rear panel hooks (four)
3.
Arrange the rack frame after verifying that the holes in the frame and anchoring points are aligned.
4.
Connect four anchoring points on the bottom of the rack.
NOTICE
Anchor the frame with M16 bolts and nuts.
The fastening torque should be 140Nm / 1,425kgf cm.
Check the rack and other parts for distortion caused by unpacking.
Figure 3-11: Rack Anchoring Points (4 EA)
Bottom of the Rack Frame
Содержание U6A4
Страница 1: ...English 8 2020 Rev 0 3 LIB System for UPS U6A4 Installation Manual 128S ...
Страница 4: ...English 8 2020 Rev 0 3 ...
Страница 10: ...Important Safety Instructions vi English 8 2020 Rev 0 3 ...
Страница 17: ...Table of Contents English 8 2020 Rev 0 3 vii ...
Страница 18: ......
Страница 60: ...3 Installing the Product 42 English 8 2020 Rev 0 3 Figure 3 33 Fuse Busbar Left Assembly Fuse Cover ...
Страница 79: ...3 Installing the Product English 8 2020 Rev 0 3 61 Figure 3 63 Remove Battery Modules 9 s Front Cover ...
Страница 116: ...3 Installing the Product 98 English 8 2020 Rev 0 3 Figure 3 126 AC Input Terminals of SMPS Assembly 1 Phase Type B ...
Страница 125: ...Memo ...
Страница 126: ...Memo ...
Страница 127: ...Memo ...
Страница 128: ...www SamsungSDI com ...