3
.
Installing the Product
106
English 8/2020. Rev 0.3
3.10.16 Switching on the MCCB
After powering on the battery system’s SMPS Assembly and SMU, and configuring the System BMS and the Rack
BMS according to the installation, check the indicator LED to determine whether the system status is normal. Refer
to the “Product Specification” and “Operation and Maintenance Manual” for information on the indicator LED.
CAUTION
Follow the instruction and guidelines for the UPS on connecting the battery to the UPS before
switching on the MCCB.
The MCCB in the SMU should be in the “TRIP” position during installation.
Figure 3-133: MCCB Handle in Trip Position
Shift the handle of the MCCB to “OFF.”
Figure 3-134: MCCB Handle in Off Position
Then shift the handle to “ON” to connect the battery system to the UPS DC link.
Figure 3-135: MCCB Handle in On Position
Содержание U6A4
Страница 1: ...English 8 2020 Rev 0 3 LIB System for UPS U6A4 Installation Manual 128S ...
Страница 4: ...English 8 2020 Rev 0 3 ...
Страница 10: ...Important Safety Instructions vi English 8 2020 Rev 0 3 ...
Страница 17: ...Table of Contents English 8 2020 Rev 0 3 vii ...
Страница 18: ......
Страница 60: ...3 Installing the Product 42 English 8 2020 Rev 0 3 Figure 3 33 Fuse Busbar Left Assembly Fuse Cover ...
Страница 79: ...3 Installing the Product English 8 2020 Rev 0 3 61 Figure 3 63 Remove Battery Modules 9 s Front Cover ...
Страница 116: ...3 Installing the Product 98 English 8 2020 Rev 0 3 Figure 3 126 AC Input Terminals of SMPS Assembly 1 Phase Type B ...
Страница 125: ...Memo ...
Страница 126: ...Memo ...
Страница 127: ...Memo ...
Страница 128: ...www SamsungSDI com ...