OfficeServ 100 Installation Manual/Ed.00
© SAMSUNG Electronics Co., Ltd.
2-3
2.2 Unpacking and Inspection
Check to see that Basic KSU carton includes the following items.
Basic KSU
Spare Parts Assembly
Check to see that Expansion KSU carton includes the following items.
Expansion KSU
Spare Parts Assembly
Before installing OfficeServ 100
Unpack and inspect each card before installing. Check for signs of physical
damage. If any damage is detected, do not attempt to install. Contact Samsung
Technical Support Department immediately.
Содержание OFFICESERV 100 Series
Страница 1: ...GABD 000100 Ed 00 OfficeServ 100 Installation Manual 10 2004 ...
Страница 6: ...INTRODUCTION IV SAMSUNG Electronics Co Ltd This page is intentionally left blank ...
Страница 54: ...CHAPTER 4 Power Up Procedures 4 4 SAMSUNG Electronics Co Ltd This page is intentionally left blank ...
Страница 62: ...CHAPTER 5 Connecting Trunk Line Circuit 5 8 SAMSUNG Electronics Co Ltd This page is intentionally left blank ...
Страница 88: ...CHAPTER 7 Connecting Optional Equipment 7 12 SAMSUNG Electronics Co Ltd This page is intentionally left blank ...