80
80
Installation guide
Installation guide
6-7. Insulation Material Finishing
6-7. Insulation Material Finishing
1)
1)
In a water soaking test, if there
In a water soaking test, if there is no leakage, then insulate the bonded areas.
is no leakage, then insulate the bonded areas.
Insulating bonded/joint area of Drainpipe
Insulating bonded/joint area of Drainpipe
Содержание MXJ-YA1509 Series
Страница 1: ......
Страница 137: ...136 136 Installation guide Installation guide...