1
1
. General installation Guide
. General installation Guide
18
18
(3) Connecting the equipment
(3) Connecting the equipment
Picture
Picture
Work
Work Description
Description
Things
Things to
to do
do
Check
Check point
point
Mounting an
Mounting an
indoor unit.
indoor unit.
A group of two works
A group of two works
on the indoor unit.
on the indoor unit.
Check for levelness of the
Check for levelness of the
indoor unit and damage to
indoor unit and damage to
the indoor unit.
the indoor unit.
(4) Inserting a vibration-proof rubber mat
(4) Inserting a vibration-proof rubber mat
Picture
Picture
Work
Work Description
Description
Things
Things to
to do
do
Check
Check point
point
Insert a vibration
Insert a vibration
proof rubber mat
proof rubber mat
between the bolt
between the bolt
and the indoor unit
and the indoor unit
to prevent transfers
to prevent transfers
of the vibration.
of the vibration.
Do not allow the
Do not allow the
vibration proof rubber
vibration proof rubber
mat to be inclined
mat to be inclined
toward either side. Do
toward either side. Do
not omit any of them.
not omit any of them.
Check the insertion condition
Check the insertion condition
of the vibration proof rubber
of the vibration proof rubber
mat.
mat.
(5) Check the horizontal height
(5) Check the horizontal height
Picture
Picture
Work
Work Description
Description
Things
Things to
to do
do
Check
Check point
point
Adjust the
Adjust the
horizontal height.
horizontal height.
Check if the indoor unit
Check if the indoor unit
is horizontally flat?
is horizontally flat?
Considering the ceiling
Considering the ceiling
finishing line, check your
finishing line, check your
installation.
installation.
(6) Installation completed
(6) Installation completed
Picture
Picture
Work
Work Description
Description
Things
Things to
to do
do
Check
Check point
point
-
-
-
-
--
Содержание MXJ-YA1509 Series
Страница 1: ......
Страница 137: ...136 136 Installation guide Installation guide...