3.
3.
Guideline for each installation process
Guideline for each installation process
50
50
2-2. Support work
2-2. Support work
1)
1)
Installation guideline for a
Installation guideline for a vertica
vertical piping
l piping
▶
▶
Down-stopper
Down-stopper fixing
fixing guide
guide
Height
Height
Fixing
Fixing interval
interval
Remarks
Remarks
1
1
lower
lower
Fix a pipe every
Fix a pipe every
5m(16.5ft)
5m(16.5ft)
If there is a pit,
If there is a pit,
fix a pipe at each
fix a pipe at each
floor
floor
2
2
Higher than
Higher than
15m
15m
Install a down
Install a down
stopper every
stopper every
3floor or every
3floor or every
15m height
15m height
Pipe must be
Pipe must be
fixed at every 5m
fixed at every 5m
※
※
How to fix a pipe
How to fix a pipe
- Utilize
- Utilize
““
U
U
””
shape volt or circular band on th
shape volt or circular band on the insulation of the pipe
e insulation of the pipe
Fixing
Fixing with
with a
a circular
circular band
band
Fixing
Fixing with
with a
a Down-stopper
Down-stopper
2)
2)
Down-stopper installation
Down-stopper installation
①
①
Attaching the Down-stopper
Attaching the Down-stopper
②
②
Brazing work
Brazing work
③
③
Assembly of
Assembly of wall contact part
wall contact part
to the vertical pipe
to the vertical pipe
⑤
⑤
Finished sample
Finished sample
④
④
Insulating
Insulating a
a pipe
pipe
Assembled
Assembled sample
sample
Attaching
Attaching the
the down
down stopper
stopper to
to the
the
vertical pipe
vertical pipe
Heat uniformly until a base metal
Heat uniformly until a base metal
become cherry red in color than
become cherry red in color than
apply a filter metal
apply a filter metal
Tightly
Tightly wrap
wrap the
the insulation
insulation with
with a
a
finishing tape
finishing tape
Содержание MXJ-YA1509 Series
Страница 1: ......
Страница 137: ...136 136 Installation guide Installation guide...