85
85
3.
3.
Guideline for each installation process
Guideline for each installation process
9. Vacuum drying
9. Vacuum drying
9-1. Purposes
9-1. Purposes
Using vacuum drying, the moisture inside the p
Using vacuum drying, the moisture inside the product or pipe can be evaporated.
roduct or pipe can be evaporated.
9-2. Procedure (HR Modulation Installation Standard)
9-2. Procedure (HR Modulation Installation Standard)
1) Before starting
1) Before starting
(1) Check if the second a
(1) Check if the second air tight test (outdoor unit, MCU, indoor unit pipes a
ir tight test (outdoor unit, MCU, indoor unit pipes are all connected.).
re all connected.).
(2) After the second air tight test, check if the pressure is down to 1Mpa and check if there is any
(2) After the second air tight test, check if the pressure is down to 1Mpa and check if there is any
leakage of nitrogen gas.
leakage of nitrogen gas.
(3) Minimum two sets of R410a gauge manifolds, five or more manifold
(3) Minimum two sets of R410a gauge manifolds, five or more manifold hoses, more than one vacuum
hoses, more than one vacuum
pump.
pump.
(4) Power up the indoor/outdoor unit. In case of HR, if the power is not on, then all the valves inside
(4) Power up the indoor/outdoor unit. In case of HR, if the power is not on, then all the valves inside
the MCU are closed.
the MCU are closed. So the vacuum may not be achieved by using the
So the vacuum may not be achieved by using the S/V of the outdoor unit.
S/V of the outdoor unit.
2) Connect the gauge manifold to achieve a vacuum for the following pipes.
2) Connect the gauge manifold to achieve a vacuum for the following pipes.
(1) Liquid pipe
(1) Liquid pipe
(2) Gas pipe
(2) Gas pipe
(3) High-pressure gas pipe
(3) High-pressure gas pipe
(4) Oil Equalizing pipe
(4) Oil Equalizing pipe
(If the manifold can’t achieve a perfect vacuum, then purge it with refrigerants.)
(If the manifold can’t achieve a perfect vacuum, then purge it with refrigerants.)
3
3
)
) Connect the
Connect the prepared two
prepared two manifold g
manifold gauges and
auges and five
five hoses
hoses as
as shown
shown below
below and
and
connect to each service valve.
connect to each service valve.
Содержание MXJ-YA1509 Series
Страница 1: ......
Страница 137: ...136 136 Installation guide Installation guide...