
LED R&D Lab(VD)
92
①
BEZEL TOP/BOTTOM disassemble :
screw disassemble
SCREW
BRACKET-SUPPORT L/R
SCREW SPECIAL
SCREW MACHINE
1
3
2
ⓐ
ⓑ
MAGNET
SCREW
⑤
Place the EPE PAD on the floor, place
the module facing the floor, and
assemble the COVER CORNER to prevent
damage.
①
Front
분해
Product disassembly method – 1) Screen Desorption 110”
②
BEZEL SIDE disassemble : Magnet desorption
③
BRACKET-SUPPORT disassemble
④
Separated in order of outside → inside (1 → 2
)
* Before separation, pull the bottom to create a space and
remove the CABLE first
Содержание IAB Series
Страница 1: ...LED R D Lab VD LED Display Install Manual IAB Series LH008IAB LH012IAB LH016IAB Ver 1 4 ...
Страница 25: ...146 ...
Страница 48: ...110 ...
Страница 67: ...146 ...
Страница 72: ...110 ...
Страница 90: ...Thank you ...
Страница 115: ...LED R D Lab VD 114 Product disassembly method 3 Sub Screen Internal decomposition First fully connected state ...
Страница 122: ...LED R D Lab VD 121 First fully connected state Product disassembly method 3 Sub Screen Internal decomposition ...