
LED R&D Lab(VD)
50
③ What should be done when there is a gap between the LEDs (2x3) in the
cabinet
- Check the gap between the cabinet (2x3) LED modules before installation.
-
if there is a gap, screw the area of Figure 1 to adjust the height of the low part to the high part.
Fig1.
LED module gap adjustment area
Fig.2 into screw
4. FRAME installation and cable connection
Содержание IAB Series
Страница 1: ...LED R D Lab VD LED Display Install Manual IAB Series LH008IAB LH012IAB LH016IAB Ver 1 4 ...
Страница 25: ...146 ...
Страница 48: ...110 ...
Страница 67: ...146 ...
Страница 72: ...110 ...
Страница 90: ...Thank you ...
Страница 115: ...LED R D Lab VD 114 Product disassembly method 3 Sub Screen Internal decomposition First fully connected state ...
Страница 122: ...LED R D Lab VD 121 First fully connected state Product disassembly method 3 Sub Screen Internal decomposition ...