
LED R&D Lab(VD)
46
⑭
When the ASSY BRACKET P-
FRONT installation is complete, fix it with the BRACKET SUPPORT on the left and right sides
.
-
BRACKET-SUPPORT assembly position is generally assembled with top/bottom center 3POINT. (Addable depending on the situation)
- After assembling the SCREW-SPECIAL into the BRACKET-SUPPORT, turn it and push the inside.
Fig.1 BRACKET
-SUPPORT INSTALL
BRACKET-
SUPPORT LEFT RIGHT
SCREW SPECIAL
SCREW MACHINE
4. FRAME installation and cable connection
Содержание IAB Series
Страница 1: ...LED R D Lab VD LED Display Install Manual IAB Series LH008IAB LH012IAB LH016IAB Ver 1 4 ...
Страница 25: ...146 ...
Страница 48: ...110 ...
Страница 67: ...146 ...
Страница 72: ...110 ...
Страница 90: ...Thank you ...
Страница 115: ...LED R D Lab VD 114 Product disassembly method 3 Sub Screen Internal decomposition First fully connected state ...
Страница 122: ...LED R D Lab VD 121 First fully connected state Product disassembly method 3 Sub Screen Internal decomposition ...