
LED R&D Lab(VD)
61
⑬ LEFT and TOP DECO are assembled first in order to create an environment where SET tilt can be adjusted.
1. LEFT DECO Installation
2. TOP DECO Installation
3. Screw coupling
M3
M4
M4
M4
Fig.1
Deco assembling sequence
Fig.2
Completion of assembling
4. FRAME installation and cable connection
Содержание IAB Series
Страница 1: ...LED R D Lab VD LED Display Install Manual IAB Series LH008IAB LH012IAB LH016IAB Ver 1 4 ...
Страница 25: ...146 ...
Страница 48: ...110 ...
Страница 67: ...146 ...
Страница 72: ...110 ...
Страница 90: ...Thank you ...
Страница 115: ...LED R D Lab VD 114 Product disassembly method 3 Sub Screen Internal decomposition First fully connected state ...
Страница 122: ...LED R D Lab VD 121 First fully connected state Product disassembly method 3 Sub Screen Internal decomposition ...