
LED R&D Lab(VD)
32
⑥
-2 Close the bottom of ASSY BRACKET P-FRAME to the wall
-
** This course is not an essential course that must be done
(Use only when you need to fix the bottom part completely)
-
Fix the bottom part using the bolt and ring enclosed in the Accessory kit
Fig.1
Wall hole opening
Fig.2
Bolt coupling
After removing PC SHEET, pierce
the wall based on the hole
Holder bolt
Holder ring
Anchor bolt
WALL direction
SCREEN direction
4. FRAME installation and cable connection
Содержание IAB Series
Страница 1: ...LED R D Lab VD LED Display Install Manual IAB Series LH008IAB LH012IAB LH016IAB Ver 1 4 ...
Страница 25: ...146 ...
Страница 48: ...110 ...
Страница 67: ...146 ...
Страница 72: ...110 ...
Страница 90: ...Thank you ...
Страница 115: ...LED R D Lab VD 114 Product disassembly method 3 Sub Screen Internal decomposition First fully connected state ...
Страница 122: ...LED R D Lab VD 121 First fully connected state Product disassembly method 3 Sub Screen Internal decomposition ...