43
English
Instal
lation
To complete the installation, perform the following checks and tests to ensure that the air conditioner operates correctly.
Check the followings.
•
Strength of the installation site
•
Tightness of pipe connection to detect a gas leak
•
Electric wiring connections
•
Heat-resistant insulation of the pipe
•
Drainage
•
Earth conductor connection
Final Checks and User Tips
AM072TNZDCH_IM_DVM V-AHU_AA_EN_.indd 43
2020-02-14 오전 10:33:41
Содержание AM0 SERIES
Страница 45: ...45 English Appendix Memo AM072TNZDCH_IM_DVM V AHU_AA_EN_ indd 45 2020 02 14 오전 10 33 41 ...
Страница 46: ...AM072TNZDCH_IM_DVM V AHU_AA_EN_ indd 46 2020 02 14 오전 10 33 41 ...
Страница 91: ...45 Français Annexe Note AM072TNZDCH_IM_DVM V AHU_AA_FR_ indd 45 2020 02 14 오전 10 35 49 ...
Страница 92: ...AM072TNZDCH_IM_DVM V AHU_AA_FR_ indd 46 2020 02 14 오전 10 35 49 ...