56
EB 3963 EN
Decommissioning and removal
10
Decommissioning and
removal
Risk of electric shock.
−
Before performing any work on the device
and before opening the device, disconnect
the power supply and protect it against un-
intentional reconnection.
−
Only use power interruption devices that
are protected against unintentional recon-
nection of the power supply.
Risk of bursting in control valve components
due to incorrect opening.
−
Before starting any work on the solenoid
valve, depressurize all plant sections con-
cerned.
−
Observe the warnings in the actuator and
valve documentation.
10.1
Decommissioning
To decommission the solenoid valve for dis-
assembly, proceed as follows:
1. Close the shut-off valves upstream of the
solenoid valve to stop the compressed air
from flowing through the solenoid valve.
2. Relieve the pipelines completely of pres-
sure.
3. Disconnect and lock the power supply.
4. Remove the solenoid valve from the pipe-
line
10.2
Disposal
Î
Observe local, national and internation-
al refuse regulations.
Î
Do not dispose of components, lubricants
and hazardous substances together with
your other household waste.
DANGER
!
DANGER
!
Содержание 3963 Series
Страница 1: ...Translation of original instructions EB 3963 EN Edition June 2018 Type 3963 Solenoid Valves...
Страница 58: ...58 EB 3963 EN...
Страница 59: ...EB 3963 EN 59...
Страница 60: ...60 EB 3963 EN...
Страница 61: ...EB 3963 EN 61...
Страница 62: ...62 EB 3963 EN...
Страница 63: ...EB 3963 EN 63...
Страница 64: ...64 EB 3963 EN...
Страница 65: ...EB 3963 EN 65...
Страница 66: ...66 EB 3963 EN...
Страница 67: ...EB 3963 EN 67...
Страница 68: ...68 EB 3963 EN...
Страница 73: ...EB 3963 EN 73 Model 3963 3 Solenoid Valve 81 82 solenoid valve circuit...
Страница 78: ...78 EB 3963 EN...
Страница 79: ...EB 3963 EN 79...