![Samlexpower G4-2012A Скачать руководство пользователя страница 35](http://html.mh-extra.com/html/samlexpower/g4-2012a/g4-2012a_owners-manual_804926035.webp)
SAMLEX AMERICA INC. | 35
A
B
1.
2.
3.
4.
5.
9.
10.
11.
12.
13.
14.
Bus bar for Grounded Conductor (GC) / Neutral
Bus bar for Equipment Grounding Conductors (EGC)
System Bonding Jumper (SBJ)
Grounding Electrode Conductor (GEC)
Grounding Electrode (GE)
HOT IN
NEU IN
GND IN
GND OUT
NEU OUT
HOT OUT
Breaker. Use GFCI protected breaker for Branch
Circuit (please see warning)
120 VAC Leg, Phase A
120 VAC Leg, Phase B
(180º out of phase with Phase A Leg)
+
-
External
Charge
Controller
Solar Panel(s)
Fuse
Remote
Control
Battery
-
Battery
+
PV
-
PV
+
DC SIDE
AC SIDE
Solar Panel(s)
+
-
+
-
Battery
628-2011-G4 Manual_Grounding-Arrangement-Aug2011
Grounding Electrode (GE)
embedded in earth.
1
2
1
2
A
A
B
3
4
5
628-2011-G4 Manual_Grounding-Arrangement-Aug2011
Grounding Electrode (GE)
embedded in earth.
1
2
1
2
A
A
B
3
4
5
1
2
A
G-4 INVERTER
CHARGER
D.C. Ground
HOT
To
Loads
INVERTER
SUB-PANEL
Battery
Temperature
Sensor
4
1
3
1
2
1
1
1
0
1
9
N
N
SERVICE
ENTRANCE
PANEL
- Model BTS-G4
SERVICE
PANEL
(Within 7”
of battery
terminal)
Fuse
A
B
1.
2.
3.
4.
5.
9.
10.
11.
12.
13.
14.
Bus bar for Grounded Conductor (GC) / Neutral
Bus bar for Equipment Grounding Conductors (EGC)
System Bonding Jumper (SBJ)
Grounding Electrode Conductor (GEC)
Grounding Electrode (GE)
HOT IN
NEU IN
GND IN
GND OUT
NEU OUT
HOT OUT
Breaker
120 VAC Leg, Phase A
120 VAC Leg, Phase B
(180º out of phase with Phase A Leg)
External
Charge
Controller
Solar Panel(s)
Fuse
Remote
Control
Battery
-
Battery
+
PV
-
PV
+
DC SIDE
AC SIDE
+
-
Battery
628-2011-G4 Manual_Grounding-Arrangement-Aug2011
Grounding Electrode (GE)
embedded in earth.
1
2
1
2
A
A
B
3
4
5
628-2011-G4 Manual_Grounding-Arrangement-Aug2011
Grounding Electrode (GE)
embedded in earth.
1
2
1
2
A
A
B
3
4
5
1
2
A
G-4 INVERTER
CHARGER
D.C. Ground
HOT
To
Loads
INVERTER
SUB-PANEL
Battery
Temperature
Sensor
4
1
3
1
2
1
1
1
0
1
9
N
N
SERVICE
ENTRANCE
PANEL
(within 7”
of battery
terminal)
Fig. 5.13: Typical shore based installation of G4
SECTION 5 |
Installation