33
Member of EXEL group
6. Maintenance
Preventive maintenance is an essential part of production and ensures the reliability of the installation. As a
reminder, the performance of equipment can only be guaranteed if a minimum of control and cleaning
operations are performed on this equipment.
Soiling and wear of the Airmix
®
gun depend on the operating and application
conditions and the production rates.
6.1. Summary table of maintenance operations
The maintenance intervals indicated in the procedures below are only indicative. The user will have to create
his own maintenance schedule as he use
Sames
equipment.
Carry out when the maintenance indicator light of the
GNM 6080
is ON.
Procedure
Detail
Duration
Frequency
Cleaning
A
A1
Cleaning the product circuit
10 min.
Once a day
A2
Cleaning the spray gun
10 min.
Once a day
A3
Hollow cone nozzle cleaning
10 min.
Once a day
A4
Waste disposal
5 min.
Once a day
A5
Demolition and Recycling
5 min.
Once a day
Replacement
B
Paint circuit
B1
Replacement of the paint hoses
10 min.
2000 hours
B2
Replacement of the spray head assembly
5 min.
1000 hours
B3
Replacement of the electrode located in the air cap
5 min.
1000 hours
B4
Replacement of the paint needle
5 min.
2000 hours
C
Barrel
C1
Replacing the seals cartridge
10 min.
2000 hours
C2
Replacement of the air valve
5 min.
2000 hours
C3
Replacement of the high voltage cascade
20 min.
-
D
Handle
D1
Replacement of the handle
20 min.
2000 hours
D2
Replacement of the electropneumatic coupling
5 min.
4000 hours
D3
Replacement of the switch
20 min.
4000 hours
D4
Replacement of the trigger
5 min.
1000 hours
D5
Replacement of the fixing hook
5 min.
4000 hours
Содержание Nanogun+ Airmix
Страница 61: ...61 Member of EXEL group 8 1 Nanogun Airmix guns for both high resistivity HR solvent based paints 1 1 1 2 3 ...
Страница 87: ...87 Member of EXEL group 11 Appendices 11 1 Maintenance preventive plan ...
Страница 92: ...88 DRT7115 E 2022 11 Member of EXEL group 11 2 EU and UK Declarations of conformity ...