Index revision : A
18
7159
6.1.1. Inocart VT dual version
•
Step
1
: Place the wall bracket on the cabin wall.
•
Step
2
: Install the dual plunger wiring set.
•
Step 3
:
Install the 2nd Inobox control module and et connect (
) the 2nd
wiring set.
•
Step
4
: Connect the Inogun 12 m to the Inobox.
•
Step
5
: Install the support of the 2 tubes on
the support arm.
•
Step
6
: Install the 2 tubes equipped with the
2 CS130 pumps, connect the 2 tubes to the
second powder pump, blue to blue, red to
red.
Connect the fluidizing hose to the tube.
•
Step
7
: Connect the powder hose of the
2nd gun to the 2nd pump CS 130 and
connect the electrode blowing hose on
the Inobox control module side and on the
gun side.
•
Step
8
: Connect the power supply cable of the second Inobox.