Index revision : A
17
7159
6. Installation
The "Inocart VT or H" carts are delivered assembled.
6.1. Vibrating table version
•
Step 1
: Place the support arm in its housing.
•
Step 2
: Place the plunger tube equipped
with the CS 130 pump in the support arm
and connect the 2 hoses to the powder
pump blue to blue, red to red.
Connect the fluidizing hose to the tube.
•
Step 3
: Connect the 5 m earthing cable to
an electrically earthed part of the applica-
tion booth.
•
Step 4
: Connect the Inobox's power supply
plug.
•
Step 5
: Connect the powder supply hose
from the gun to the CS 130 pump and
connect the electrode blowing hose on the Inobox module side and on the gun side.
The Inocart cart is ready to start the powder application.
Step 1
Step 2
Step 3