background image

14

Drilling & Tapping Machine

4-5

4-5

Determine main 

shaft speed

주축회전속도의 선정

It

s called, 1st level ~ 4th level from the upper part of V-pulley. The 

rpm in each level is shown below.

V-풀리의 윗단부터 1,2,3,4단으로 호칭하며 각단별 회전수는 아래
표와 같습니다.

내용

Contents

1단

Level 1

2단

Level 2

3단

Level 3

4단

Level 4

D-360 회전수 / 

RPM

2,800

1,600

900

500

D-410 회전수 / 

RPM

2,400

1,360

780

480

Turn off the power while converting the belt. Watch your hand while 
you are at it.

벨트 변환시 전원을 꺼주시고 손이 감기지 않도록 주의 하십시오. 

Fig.6

조임
Fixed

풀림
Open

모터고정레버

Motor lock lever

벨트인장레버
Belt tension lever

스핀들 V-풀리
Spindle V-pully

모터 V-풀리
Motor V-pully

V-풀리

V-pully

!

CAUTION

!

CAUTION

주 의

Содержание SMD Series

Страница 1: ...ruction Manual Please read and understand DANGER WARNING items in this maunal before operating the drilling machine Please keep this manual by your side for answers to any questions you may have and t...

Страница 2: ......

Страница 3: ...ions Warning term DANGER WARNING CAUTION IMPORTANT Indicates an imminently hazardous situation which if not avoided will result in death or serious injury These warning messages include the preventive...

Страница 4: ...4 Drilling Tapping Machine 1 2 2 1 2 2 3 3 1 3 2 4 4 1 4 2 4 3 4 4 4 5 5 6 7 8 9 6 9 9 9 10 10 11 12 12 12 13 13 14 16 16 17 18 19...

Страница 5: ...Mounting 3 1 Power connection 3 2 Electric circuit diagram 4 Operating 4 1 Start 4 2 Drilling 4 3 Mechanical spring adjustment 4 4 Belt conversion 4 5 Determine spindle speed 5 Precutions 6 Maintenanc...

Страница 6: ...se read this manual before operating the drilling machine and follow the directions Samchully does not assume responsibility for accidents resulting from a failure to follow the guidelines in this man...

Страница 7: ...rate a machine while under the influence of alcohol or drugs Gloves and ties should not be worn when operating a machine Being under the influence lowers judgment and increases likelihood of accident...

Страница 8: ...machine use rope or wire rope In case the machine is operated by 380V turn the switch to 380V and switch the motor wiring as well Page 10 Never attept to apply unreasonable force and shock to handle C...

Страница 9: ...tor Column Belt cover Belt tension lever Base Table Lifting rack Lifting handle Connecting rod Fixed handle Drill chuck h Trandport handle 2 h Max Swing 2 h When the motor rotates with the supplied po...

Страница 10: ...380V please have the motor wiring changed as shown the figure below In case the machine is operated by 380V a light bulb can not be used Single phase 220V products can not be converted to 380V 3 Moun...

Страница 11: ...ric circuit diagram Symbol Explanation M Motor L1 Lamp L2 Socket P1 Plug D1 VCT VCT Electric wire SS Push button switch S1 Lamp switch D2 Vinyl electric wire Legend Fig 3 P1 D2 D2 L2 L1 T M D1 S1 SS P...

Страница 12: ...indicates zero In other words it called if it goes down up to OOO mm it s processed bored up to 000 mm Put the drill up to the depth of base hole and turn the scale on transfer ring into the moving di...

Страница 13: ...belt cover is opend the figure below shows that the motor V pulley and spindle V pulley are to be revolved If motor fixing lever is released and belt tension lever is pushed back the motor V pulley p...

Страница 14: ...each level is shown below V 1 2 3 4 Contents 1 Level 1 2 Level 2 3 Level 3 4 Level 4 D 360 RPM 2 800 1 600 900 500 D 410 RPM 2 400 1 360 780 480 Turn off the power while converting the belt Watch your...

Страница 15: ...ld cast iron Hard cast iron Brass Aluminum 3 1 800 1 270 4 1 800 1 350 960 1 750 5 1 460 1 080 760 1 800 1 400 6 1 220 900 640 1 500 1 170 8 920 680 480 1 110 880 10 730 540 380 890 700 1 750 12 610 4...

Страница 16: ...ve slower Grease the spindle spool line approximately once a six month through V shaft nut Lubricate properly the other friction surfaces Increase in motor temperature Cutting oil Lubrication 1 Don t...

Страница 17: ......

Страница 18: ...m Tap dimension Drill dia mm 2 56 UNC 1 75 1 4 20 UNC 5 10 9 16 12 UNC 12 20 4 40 UNC 2 20 5 16 18 UNC 6 50 5 8 11 UNC 13 60 5 40 UNC 2 50 3 8 16 UNC 8 00 3 4 10 UNC 16 60 6 32 UNC 2 70 7 16 14 UNC 9...

Страница 19: ...rity of the top surface Up and down 0 04 Front and rear 0 04 Perpendicularity between the centerline of the main shaft and top surface of the table Left and right 0 04 Front and rear 0 04 100mm Run ou...

Страница 20: ...n o t e...

Страница 21: ...n o t e...

Страница 22: ......

Страница 23: ......

Страница 24: ...d u kt io n u b er w ac h t B au ar t g ep ru ft s ISO 9001 2008 Samchully Machinery 405 820 99 TEL 82 32 822 4811 FAX 82 32 822 4377 405 820 99 Namdong daero Namdong gu Incheon Korea TEL 82 32 899 8...

Отзывы: