- 23 -
8.- EQUIPMENT START UP AND SHUTDOWN.
8.1.- Controls before starting up the unit.
• Carefully check that all the connections have been done correctly and enough tighten by respecting the labelling of the
equipment and the instructions of the chapter 7.
• Check the circuit-breakers of the
UPS
are switched «OFF».
• Supply voltage to the equipment, by switching «On» the protections of the distribution board of the input mains (earth leakage
breaker and circuit-breaker).
•
Follow the established order for start up and shutdown the
UPS
.
8.2.- First or after a complete shutdown start up.
• Switch «On» the battery
(M2)
and input
(M1)
circuit-breakers of the
UPS
. The
(LCD)
panel lights and the fans and battery
charger will start.
•
Before using the
UPS
for the first time or after a longer shutdown of more than 6 months, it is necessary to charge the
batteries during as minimum 8 hours. Do not continue with the start up procedure until having lapsed this time.
• Press during at least 3 seconds the
(ON/OFF)
key of the control panel, the led
( )
will light. The system will carry out an
internal test and once it is concluded, the inverter of the
UPS
will start up and supply output voltage.
Any anomaly in the mains will be absorbed by the equipment.
During the start up procedure the
(LCD)
panel shows the message «READY ON» and when the equipment is supplying output
voltage the led
(
)
lights and the
(LCD)
panel shows the message «LINE MODE».
• Switch «On» the outgoing protections, if you have them and start the critical loads to be supplied.
8.3.- Daily UPS shutdown, «inverter» shutdown.
• Stop the loads and press on the
(ON/OFF)
key during as minimum 3 seconds, the inverter will be shutdown.
• The LCD panel will show «SHUTDOWN » during some seconds, after them the
(LCD)
panel will only be lighted and with the
fans and battery charger are still ON.
8.4.- Daily UPS start up, «inverter» start up.
• Press during at least 3 seconds the
(ON/OFF)
key of the control panel. The system will make an internal test and once it is
concluded, the inverter of the
UPS
will start up and supply output voltage. Any anomaly in the mains will be absorbed by the
equipment.
During the start up procedure the
(LCD)
panel shows the message «READY ON» and when the equipment is supplying output
voltage the led
(
)
lights and the
(LCD)
panel shows the message «LINE MODE».
• Start up the critical loads to be supplied.
Содержание SLC Link Series
Страница 1: ...EK708A01 SLC LINK Service Manual...
Страница 64: ...63...
Страница 65: ...08460 Palautordera Tel 34 93 848 24 00 sat salicru com salicru com...
Страница 99: ...34...
Страница 138: ...73...
Страница 139: ...74...
Страница 140: ...75...
Страница 141: ...08460 Palautordera Tel 34 93 848 24 00 sat salicru com salicru com...