background image

CDP 300 / 350 KP_MAN_EN

 

VERS. 2017.04.25

 

16

 

 

 

 

 

 

4.5 

Safety instructions for certain phases of work

 

 

Before commissioning:

 

 

Avoid any work that could interfere with safety! Before starting work, familiarize yourself with the 
working conditions existing on the site!

 

These conditions include, for example, the obstacles present in the working and traffic area, the re- 
sistance of the ground and the necessary protective devices between the site and the public road! 
Take measures to ensure that the machine operates only in a safe and operable condition!

 

Only operate the machine when all protective and safety devices, such as removable protective 
devices etc, are in place and in working order!

 

Comply with technical safety and occupational health regulations.

 

Check the machine at least once per workstation for damage and defects visible from the outside! 
Report immediately any changes (including changes in work behavior) to the appropriate person / 
position!

 

In case of malfunction, stop the machine immediately and lock it! Make it troublesome immedi- 
ately!

 

The operator must ensure that he has a free field of view on his workstation so that he can inter- 
vene at any time in the work process.

 

Use only under watering, to avoid the formation of dust that is harmful to health and to increase the 
lifetime of the tool.

 

During start-up and shut-down operations observe the control indicators according to the operating 
instructions!

 

Before starting the machine, make sure that nobody can be take a risk by starting the machine. 
Keep children and unauthorized persons away from the work area.

 

The noise protection devices must be in place on the machine during the working phases, the user 
and persons present at the workplace must wear the necessary noise protection!

 

Be sure to keep your distances from the trenches and embankments! Do not perform work when 
the machine is not in a safe working position! The workplace must be clean and tidy! Disorder in- 
creases the risk of accidents! Do not work when you are tired. Concentrate on your work.

 

Beware of tripping! Always unroll fully extension cords and hose rollers. After assembly, do not 
leave tools, like keys on the machine.

 

Diamond drills must comply with NORTON CLIPPER specifications. Defective tools must be re- 
moved and replaced immediately. Check if the area is crossed by electrical, water or gas lines!

 

 

 

During commissioning

 

 

Fix the drill securely and check it during the drilling operation!

 

Never touch the rotating parts, especially the drill and the drive shaft!

 

 

After commissioning

 

 

Before leaving the work area, make sure that the machine can not be switched on accidentally!

 

 

Содержание NORTON CDP 300

Страница 1: ...CDP 300 350 KP OPERATING INSTRUCTIONS Translation of the original instructions...

Страница 2: ...CDP 300 350 KP_MAN_EN VERS 2017 04 25 2...

Страница 3: ...42 CE ELECTROMAGNETIC COMPATIBILITY 2004 30 UE Exhaust Emission Directive 2012 46 UE NOISE 2000 14 CE And the European standard EN 12348 Core drilling machines on stand Safety Valid for machines as of...

Страница 4: ...CDP 300 350 KP_MAN_EN VERS 2017 04 25 4...

Страница 5: ...structions 12 4 3 Measuresoforganization 13 4 4 Selection of staff 14 4 5 Safety instructions for certain phases of work 15 4 6 Maintenance and special work on the machine 16 4 7 Gas dust steam smoke...

Страница 6: ...CDP 300 350 KP_MAN_EN VERS 2017 04 25 6...

Страница 7: ...motor the accident prevention regulations of the responsible trade asso ciations are to be observed Read the entire operating manual carefully All pieces of advice regard ing the handling of the dril...

Страница 8: ...ating tool It is essential to stop the motor to transport the machine For transport in a vehicle secure the ma chine so that it does not tip it does not spoil and does not lose fuel Check the conditio...

Страница 9: ...Width mm 420 440 Height mm 1050 1050 Drilling area mm 110 290 110 354 Motor Solo by Alko Engine THERMAL Two stroke single cylinder Displacement cm 54 2 Bore mm 45 Piston stroke mm 34 Power kW PS 2 3 M...

Страница 10: ...uel pump Air filter Cloth Fuel tank capacity L cm 0 7 700 Mixture Engine oil 2T synthesis 1 50 1 oil volume 50 petrol volumes For further information on the Solo By Alko thermal engine please refer to...

Страница 11: ...ions NOR TON CLIPPER the responsibility of the manufacturer can under no circumstances be engaged You will find in the NORTON CLIPPER diamond tools catalog a choice of tools adapted to the needs of th...

Страница 12: ...ater hose connects to the water connection The water is thus fed directly to the drill bit by the reducer and ensures the cooling of the latter and evacuates the core drilling muds The slide 2 is tran...

Страница 13: ...o com promise safety The machine is intended exclusively for the coring of concrete reinforced concrete and masonry An other use or use beyond what is permitted such as for example For woodworking can...

Страница 14: ...must read the operating instructions before starting work and in particular the chapter Safety instructions It will be too late to do so during work This applies in particular to personnel who only oc...

Страница 15: ...m and the ways of fighting fires 4 4 Selection of staff The work to be done on with the machine can only be carried out by a trusted person Respect the minimum age required by law Use only trained per...

Страница 16: ...to avoid the formation of dust that is harmful to health and to increase the lifetime of the tool During start up and shut down operations observe the control indicators according to the operating ins...

Страница 17: ...the crane operators can only be carried out by experienced people The guide must be within the visibility range of the driver or be able to communicate verbally with the driver Use all means of acces...

Страница 18: ...e in daylight In the case of use in an ill lit or unlit work area it is the responsibility of the user site supervisor to ensure proper lighting for the jobsite 4 10 Transport For loading transport us...

Страница 19: ...uthorized persons Store the small diameter drills only in the prone position and the large diameter drills only stand up and do not put anything on top 4 12 Statement regarding the vibration emissions...

Страница 20: ...auses water and fuel supplies preparation of work moving the machine assembling The tool 4 13 Statement regarding to the noise emissions Declared noise emission valu according to EN ISO 11201 and NF E...

Страница 21: ...check its integrity before use A complete list of components can be found in the section Technical data andaccessories 5 2 Fixation of the machine 5 2 1 Thanks to the peaks of anchorage Place the mach...

Страница 22: ...chine with the pin Pull the strap through the slot of the ratchet and stretch it Opening the ratchet Reassemble the locking handle until the release The strap can then be removed 5 2 3 Thanks to the p...

Страница 23: ...5 bar Connection to core drill The tank is connected by a hose with an express connection to the motor of the drilling machine The amount of water is regulated by the tap Disconnecting the quick conne...

Страница 24: ...d to the conditions of use In case ofimproper use of the machine or with inappropriate tools the responsibility of the manufacturer can under no circumstances be incurred in case of damage or accident...

Страница 25: ...3 hole flange adapter on the gear unit Insert the adapter on the gearbox spindle so that the teeth are assembled then screw the adapter studs into the reducer shaft Reassemble the drilling trol ley s...

Страница 26: ...is lever must return to the normal running position I under the effect of its spring when the throttle trigger is pressed at the same time Check the tightening of the ignition cable contact on the spa...

Страница 27: ...gin the core drilling After priming maintain a constant coring pressure according to the material to be corroded The feed must be adapted to the material to be cut 6 3 Stop coring Turn the crank in re...

Страница 28: ...be carried out The wear parts must be checked if necessary the necessary adjustments or the defective parts must be replaced In the case of heat engines the maintenance recommended by the engine manu...

Страница 29: ...s or segment fragments segment tears drill deformation wear If you notice any such error the tool should be returned for repair Also check thethreaded connection for cleanliness A blunt drill bit must...

Страница 30: ...ecrease the rotation speed increase the water flow and increase the advance Segments worn Reform the drill Diamond granulation is embedded in the binder Sharpen the drill sharpen plate and continue th...

Страница 31: ...nts Water intake too low Increase the water intake The drill bit is locked Iron shavings are wedged between the drill and the core or the outer wall Stop the machine and unlock the tool thanks to a wr...

Страница 32: ...VERS 2017 04 25 CDP 300 350 KP_MAN_EN 31...

Страница 33: ...22 35 09 65 SAINT GOBAIN ABRASIVES BV GROENLOSEWEG 28 7151 HW EIBERGEN P O BOX 10 7150 AA EIBERGEN THE NETHERLANDS TEL 31 545 466466 FAX 31 545474605 SAINT GOBAIN ABRASIVESAS POSTBOKS 11 ALNABRU 0614...

Отзывы: