CDP 300 / 350 KP_MAN_EN
VERS. 2017.04.25
21
5
Commissioning
5.1
Delivery checks
Remove the packaging from the transport and place the machine on a flat and stable surface.
Recycle packaging in accordance with environmental regulations. As the machine is delivered as-
sembled, it is sufficient to check its integrity before use.
A complete list of components can be found in the section
“Technical data and accessories”.
5.2
Fixation of the machine
5.2.1 Thanks to the peaks of anchorage
Place the machine on the ground, perpendicular to the pipe axis, fix it with the two peak of
anchorage, so that the base of the tube adheres well to the pipe with its two points of support
(centering effect).
For better stability and good tilt, the machine may be wedged with a board at the front or at the back.
Содержание NORTON CDP 300
Страница 1: ...CDP 300 350 KP OPERATING INSTRUCTIONS Translation of the original instructions...
Страница 2: ...CDP 300 350 KP_MAN_EN VERS 2017 04 25 2...
Страница 4: ...CDP 300 350 KP_MAN_EN VERS 2017 04 25 4...
Страница 6: ...CDP 300 350 KP_MAN_EN VERS 2017 04 25 6...
Страница 32: ...VERS 2017 04 25 CDP 300 350 KP_MAN_EN 31...