40
VG5 Installation & Quick-Start Manual
Operation Checkpoints:
· Motor rotates smoothly.
· Motor rotates in the correct direction.
· Motor has no abnormal vibration nor noise.
· Acceleration and deceleration are smooth.
· Unit is not overloaded.
· Status indicator LEDs and digital operator display are correct.
Operation by Digital Operator
The diagram below shows a typical operation profile using the digital operator.
Figure 15 Operation Sequence by Digital Operator
Reverse
60Hz
Forward
15Hz
Stop
1
3
4
5
6
7
Reverse Run
ON
Power
Frequency Setting
Forward Run
Frequency Reference Change
Forward
60Hz
2
Forward JOG Run
6Hz
Chapter 2 - Operation
Trial Operation
Содержание CIMR-VG5U
Страница 1: ...VG5 Series Revision F Installation Quick Start Manual General Purpose Flux Vector Inverter with AVC TM...
Страница 2: ...2 VG5 Installation Quick Start Manual This page intentionally left blank...
Страница 36: ...36 VG5 Installation Quick Start Manual This page intentionally left blank...
Страница 60: ...60 VSG5 Installation Quick Start Manual This page intentionally left blank...
Страница 113: ...VG5 Installation Quick Start Manual 113 This page intentionally left blank Appendix Notes...