background image

SAFEGREASE 2 
MAXILUBE 
 

 

MMAX1DEN.doc 

30.05.2005   Rev. 1D 

4 (9) 

 

16.  Start the pump in manual operation mode of the control unit or with pressure air manual 

control screw (21) of the pumping center's solenoid valve group, see chapter 

3.3   Manual 

operation

 . When manual control screws are used, remove the cover plate (28) and the nut 

(27) below the plate. After this remove the pumping center cover (26). 

17.  After the pressure hose is filled, stop the pump and connect the hose to the grease filter. 

18.  Fill the main header with lubricant by starting the pump in manual operation mode of the 

control unit or with pumping center's solenoid valve group's manual control screws for 
pressure air and lubrication lines (22 and 23). Stop the pump when the main header is 
filled and air is removed. 

19.  Remove the plug from the tank connection of the pump and fasten the tank hose. 

20.  Ensure before connecting the tank hose that only grease (no air) is coming out of the hose. 

If needed, pressurize the system again. Pressure air in the system prevents its trouble-free 
operation. 

21.  Do a test pressurization of main header by increasing the pressure with the pressure 

control device at the pumping center up to 250 bar (3600 psi) (24). The pump will stop due 
to backpressure in 250 bar (3600 psi) if there is no air or leakage in the main header. 

22.  Set the maximum pressure of the pumping center with the pressure control device. The 

maximum pressure of the pumping center should be set approximately 20 % higher than 
the pressure by which the pressure control unit acknowledgement pressure is reached. For 
example, if the acknowledgement pressure level is reached when the pressure of the 
pumping center is 170 bar (2500 psi), the maximum pressure should be set at 200 bar 
(3000 psi). 

23.  Replace the pumping center cover (26). Fasten the nut (27) and the cover plate (28). 

3.2   Changing the lubricant barrel 

Caution 

Make sure that no impurities can enter the pump, follower plate or the 
lubricant barrel during the barrel change procedures. 

 

Caution 

Clean or replace the grease filter cartridge when you are changing the 
barrel. Remove pressure from the grease filter before opening it with the 
help of venting screw which is located in the filter plug. 

 

Caution 

Ensure that the system is not under pressurization during the barrel change 
procedures. 

3.2.1   Maxilube-ECO 

Note 

Numbers in brackets are part numbers of drawing 461983A. 

 

1.  Ensure that the surroundings of the pumping center are clean. Impurities in the system 

prevent trouble-free operation and cause damage when reaching the lubrication point. 

2.  Switch off the power on the pumping center when changing the barrel. 

3.  Disconnect the pressure air hose (6), the lubricant pressure hose (21) and the tank hose 

(7) from the pump (5). 

4.  Lift out the pump from the lubricant barrel and place it on the pump bracket (27) or on a 

clean, e.g. plastic base. Be careful not to damage the suction part on the bottom part of the 
pump. 

5.  Remove the lid (4) from the top of the barrel. 

Содержание MAXILUBE 2

Страница 1: ...STA 1 3 OPERATION 2 3 1 Start up 2 3 1 1 Maxilube ECO 2 3 1 2 Maxilube STA 3 3 2 Changing the lubricant barrel 4 3 2 1 Maxilube ECO 4 3 2 2 Maxilube STA 5 3 3 Manual operation 6 4 SETTINGS 7 5 TECHNIC...

Страница 2: ...vered with the following additional pieces of equipment barrel lid pos 13 follower plate pos 14 barrel low level switch pos 15 and grease filter pos 16 Note The follower plate is not used with grease...

Страница 3: ...id 4 on top of the lubricant barrel Fasten the lid with wing screws on the lubricant barrel 5 Place the pump 5 through the lid into the follower plate central unit Ensure that the pump is attached to...

Страница 4: ...n and cause damage when reaching the lubrication point 2 Check the state of the lubricant barrel 1 Damages on the surface prevent the lowering of the follower plate 2 3 Remove the lid from the barrel...

Страница 5: ...ntrol device The maximum pressure of the pumping center should be set approximately 20 higher than the pressure by which the pressure control unit acknowledgement pressure is reached For example if th...

Страница 6: ...TA Note Numbers in brackets are part numbers of drawing 461993B 1 Ensure that the surroundings of the pumping center are clean Impurities in the system prevent trouble free operation and cause damage...

Страница 7: ...ssure gauge at the pumping center rises to 200 250 bar 3000 3600 psi turn the manual control screw of solenoid valve MV3 to its initial position 90 counter clockwise to stop the pump 4 Let the pressur...

Страница 8: ...350 bar 2900 5000 psi 5 TECHNICAL SPECIFICATION 5 1 Technical specifications Quantity Value Unit Description t 10 50 14 122 C F Operation temperature p 4 7 60 100 bar psi Pressure range for pneumatic...

Страница 9: ...is used 230 Power input 230 V Control voltage if external control is used D IF105 User interface IF 105 X External control E R Connections R threads U Connections NPT threads F A Options LG ind spray...

Страница 10: ...lid set assembly drawing 361189A See MAX LIDSET 1 1 ECO 590 lid set assembly drawing 361188A 6 2 Maxilube STA See MAX LIDSET 1 4 STA 370 lid set assembly drawing 361191A See MAX LIDSET 1 1 STA 590 li...

Страница 11: ......

Страница 12: ......

Страница 13: ......

Страница 14: ......

Страница 15: ......

Страница 16: ......

Страница 17: ......

Страница 18: ......

Страница 19: ......

Страница 20: ......

Страница 21: ......

Страница 22: ......

Отзывы: