![SAelen TS GS/PUMA 35D Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/saelen-ts/gs-puma-35d/gs-puma-35d_operating-manual_3210207005.webp)
Before our machines are delivered they pass a tight quality control in the works
Given that we no longer have a bearing on the machine after it leaves the works, the dealer has to perform
another check before the delivery to the end customer
The following is to be checked
Exterior damages produced by transport etc
Tight seat of all screw and hose connections
Complete functional control of all parts
This control is to be confirmed with stamp and signature on the
Machine Delivery Document
If the fully
completed and signed delivery document is not returned there is no right for warranty
Furthermore, it is required to check all screw connections for tight seat and the laid hoses for marks of
abrasion
Agree a date for this directly with your customer
Regular inspections according to the operating manual are to be met
Controlled quality – an important step towards customer satisfaction!
Play your part
Содержание GS/PUMA 35D
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 28: ...nuts...
Страница 29: ......
Страница 30: ......
Страница 36: ......
Страница 37: ...slightly tensioned Correctly retighten locknut...
Страница 38: ......
Страница 50: ......
Страница 52: ......
Страница 53: ...One blade type fuse 40 A is located in the fixture on the battery cable beside the starter motor...
Страница 54: ...1...
Страница 57: ...Specifications...
Страница 58: ......
Страница 59: ...PUMA 120 bar Hydraulic Circuit Diagram Infeed roller Con veyor Backwards Forwards...
Страница 64: ......